My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 3:10:02 PM
Creation date
6/23/2020 6:57:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2013-2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 Page of <br />4. TANK ANNULAR TESTING <br />Test Method Developed By: x Tank Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />Comments — (include information on repairs made prior to testing, and recommended follotiv-up for failed tests) <br />Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br />containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment <br />testing. {California Code of Regulations, Title 23, Section 2637(a)(6)) <br />D Other (Spec) <br />Test Method Used: <br />0 Pressure <br />x Vacuum <br />D Hydrostatic <br />0 Other (Spec) <br />Test Equipment Used: Vacuum Pump/Vacuum Gauges <br />Equipment Resolution: -1/2"x 30" <br />Tank #187 Master <br />Tank #2 87S / 91 <br />Tank #3 Tank #4 <br />Is Tank Exempt From Testing?' <br />D' Yes x No <br />a Yes x No <br />0 Yes No LJ Yes No <br />Tank Capacity: <br />19,703 <br />10,369 / 11,849 <br />Tank Material: <br />FRA <br />FRF <br />Tank Manufacturer: <br />XERXES <br />XERXES <br />Product Stored: <br />87 <br />87/91 <br />LW= WEI V LED <br />Wait time between applying <br />�� ��1� <br />pressure/vacuum/water and <br />15 minutes <br />15 minutes <br />startin test: <br />Test Start Time: <br />2:30 p.m. <br />2:45 p.m. <br />ENVIRONMENTAL WE—Al TLJ <br />Initial Reading (Rj): <br />10" Hg <br />10" Hg <br />DE RIMENT <br />Test End Time: <br />3:30 p.m. <br />3:45 p.m. <br />Final Reading (RF): <br />10" Hg <br />10" Hg <br />Test Duration: <br />1 Hour <br />1 Hour <br />Change in Reading (RF-Ri): <br />0" Hg <br />0" He <br />Pass/Fail Threshold or Criteria: <br />+/- 0" Hg <br />+/-0" <br />Test Result. <br />x Pass ❑ Fail. <br />x Pass ❑ Fail <br />Pass ❑ Fail Pass ❑ Fail <br />Was sensor removed for testing? <br />x Yes 0 No 0 NA <br />x Yes D No 0 NA <br />Yes D No 0 NA Yes 0 No DNA <br />Was sensor properly replaced and <br />x Yes O No DNA <br />x Yes D No D NA <br />Yes 0 No 0 NA Yes 0 No D NA <br />verified functional after testin ? <br />Comments — (include information on repairs made prior to testing, and recommended follotiv-up for failed tests) <br />Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br />containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment <br />testing. {California Code of Regulations, Title 23, Section 2637(a)(6)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.