My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 3:10:02 PM
Creation date
6/23/2020 6:57:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2013-2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />E <br />SWRCB, January 2002 Page _ of <br />UMS OrKS)IN 17-3 AIA 9 1 W 39 0WWRI <br />Test Method Developed By: x Piping Manufacturer E Industry Standard :1 Professional Engineer <br />D Other (Spec) <br />Test Method Used: x Pressure 0 Vacuum 0 Hydrostatic <br />-El Other (Specify) <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />Equipment Resolution: 1110-15 psi <br />" <br />Piping Run # 187 <br />Master <br />77 <br />Piping Run # 2 87 <br />Svphon <br />Piping Run #3 87 <br />Master to 91 <br />Piping Run #4 87 <br />Syphon to 91 <br />Piping Material: <br />Piping <br />FRP <br />FRP <br />FRP <br />FRP <br />gg Manufacturerr7:E.O. <br />SMITH <br />E.O. SMITH <br />E.O. SMITH <br />E.O. SMITH <br />Piping Diameter: <br />2"- 31' <br />4" <br />21'- 3" <br />2" - 3" <br />Length of Piping Run: <br />Approx. 210' <br />Approx. 10' <br />Approx. 28' <br />Approx. 32' <br />Product Stored: <br />87 <br />87 <br />NONE <br />NONE <br />Method and location of <br />piping -run isolation: <br />Test boot inside sump <br />Test boot inside sump <br />Test boot inside sump <br />Test inside sump <br />Wait time between applying <br />pressure/vacuum/water and <br />starting <br />., test: <br />5 Minutes <br />5 Minutes <br />5 Minutes <br />5 Minutes <br />Test Start Time: <br />12:30 p.m. <br />12:45 p.m. <br />12:55 p.m. <br />1:10 P.M. <br />Initial Reading (Ri): <br />5 Psi <br />5 Psi <br />5 Psi <br />5 Psi <br />Test End Time: <br />1:30 p.m. <br />1:45 p.m. <br />1:55 p.m. <br />2:10 p.m. <br />Final Reading (RF): <br />5 Psi <br />5 Psi <br />5 Psi <br />5 Psi <br />Test Duration: <br />I Hour <br />I Hour <br />I Hour <br />I Hour <br />Change in Reading (RF-Ri): <br />0 Psi <br />0 Psi <br />0 Psi <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No loss in Psi <br />No loss in Psi <br />No loss in Psi <br />No loss in Psi <br />Test Result: <br />x Pass 0 Fail <br />x Pass 0 Fail <br />X Pass 0 Fail <br />X Pass ❑Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.