My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 3:10:02 PM
Creation date
6/23/2020 6:57:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2013-2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />11 <br />SWRC8.January 2OO2 Page ___of <br />Facility is Not Equipped With Spill/Overfill Containment Boxes 0 <br />Spill/Overfill Containment Boxes are Present, but were Not Tested x <br />Test Method Developed By: 0 Spill Bucket Manufacturer 0 Industry Standard 0 Professional Engineer <br />E Other (Specify) <br />Test Method Used: 0 Pressure E, Vacuum 0 Hydrostatic <br />0, Other (Specify) <br />Test Equipment Used: Equipment Resolution: <br />Spill B <br />ox# Spill Box # Spill Box # Spill Box # <br />Bucket Diameter: <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />startina test: <br />Test Start Time: <br />Initial Reading (Rj): <br />Test End Time: <br />Final Reading, (RF): <br />Test Duration: <br />Change in Reading (RF-Rj): <br />Pass/Fail Threshold or <br />Test Result: 0 Pass I Pass I 1 0 Fail <br />Comments — (include infornialion on repairs made prior to testing, and recommen�����.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.