Laserfiche WebLink
SWRCB, January 2002 <br />Page 2 - <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />X❑ <br />Tank Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />El <br />Other (Sped) <br />Test Method Used: <br />MX <br />Pressure ❑ Vacuum Hydrostatic <br />Other (Spec) <br />Test Equipment Used: <br />Equipment Resolution: <br />Piping Run # 4 REG A <br />Piping Run # 4 REG B <br />Piping Run # 5 MID A <br />Piping Run # 5 MID B <br />Piping Material: <br />flexline <br />flexline <br />flexline <br />flexline <br />Piping Manufacturer: <br />environ <br />environ <br />environ <br />environ <br />Piping Diameter: <br />211 <br />211 <br />211 <br />211 <br />Length of Piping Run: <br />24011 <br />240" <br />24011 <br />240" <br />Product Stored: <br />REG UNLEAD <br />REG UNLEAD <br />MIDGRADE <br />MIDGRADE <br />Method and location of <br />sump <br />sump <br />sump <br />sump <br />piping -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />- <br />-- <br />- <br />-- <br />starting test: <br />Test Start Time: <br />-- <br />-- <br />-' <br />-- <br />Initial Reading (F4 ): <br />-- <br />-- <br />-- <br />-- <br />Test End Time: <br />-- <br />- <br />- <br />- <br />Final Reading (RF ): <br />-- <br />-- <br />-- <br />-- <br />Test Duration: <br />- <br />�- <br />-- <br />- <br />Change in Reading (RF - I I-- <br />Pass/Fail Threshold or <br />Criteria: <br />A <br />11111121M <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />