Laserfiche WebLink
SWRG:B, January 2002 <br />Page 3. <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />�X <br />Tank Manufacturer Industry Standard F-1 Professional Engineer <br />El <br />Other (Sped) <br />Test Method Used: <br />❑X <br />Pressure F Vacuum F Hydrostatic <br />Other (Spec) <br />Test Equipment Used: <br />Equipment Resolution: <br />Piping Run # 6 PRE A <br />Piping Run # 6 PRE B Piping Rua # <br />Piping Run # <br />Piping Material: <br />flexline <br />flexline <br />Piping Manufacturer: <br />environ <br />environ <br />Piping Diameter: <br />2" <br />2" <br />Length of Piping Run: <br />24011 <br />240" <br />Product Stored: <br />PREMIUM <br />PREMIUM <br />Method and location of <br />sump <br />sump <br />piping -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />-- <br />-- <br />starting test: <br />Test Start Time: <br />-- <br />-- <br />Initial Reading (RI <br />-- <br />Test End Time: <br />- <br />- <br />Final Reading (RF <br />-- <br />Test Duration: <br />-- <br />-- <br />Change in Reading (RF - RI-- <br />Pass/Fail Threshold or <br />Criteria: <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />