Laserfiche WebLink
SWRCB, January 2002 5. SECONDARY PIPE TESTING FEB'of 2 <br />� <br />Test Method Developed By: ._. Piping Manufacturer _,= � Industry Standard M Pr <br />M, Other (Specify) EN ME Tj <br />Test Method Used By: FF Pressure vacuum 17 Hydrostatic <br />Other (Specify) <br />Test Equipment Used: gauge Equipment Resolution: .20 <br />T4 <br />Piping Material: <br />= 3(?1,�i <br />Piping Manufacturer: <br />dw flex <br />dw flex <br />dw flex <br />dw flex <br />Piping Diameter: <br />environ <br />environ <br />environ <br />environ <br />Length of Piping Run: <br />2 in. <br />2 in. <br />2 in. <br />2 in. <br />Product Stored: <br />130 ft. <br />130 ft. <br />130 ft. <br />130 ft. <br />Method and location of <br />REG UNLEAD <br />REG UNLEAD <br />MIDGRADE <br />MIDGRADE <br />stp sump <br />stp sump <br />stp sump <br />stp sump <br />piping -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5 min <br />5 min <br />5 min <br />5 min <br />Test Start Time: <br />Initial Reading (Rt): <br />10:13:00 <br />10:13:00 <br />10:13:00 <br />10:13:00 <br />Test End Time: <br />5.00000 PSI <br />5.00000 PSI <br />5.00000 PSI <br />5.00000 PSI <br />Final Reading (RF): <br />11:13:00 <br />11:13:00 <br />11:13:00 <br />11:13:00 <br />Test Duration: <br />5.00000 PSI <br />5.00000 PSI <br />5.00000 PSI <br />5.00000 PSI <br />Change in Reading (Rg-RI): <br />1 hr <br />I hr <br />1 hr <br />1 hr <br />Pass/Fail Threshold or <br />0.00000 PSI <br />0.00000 PSI <br />0.00000 PSI <br />0.00000 PSI <br />-0.00000 <br />+/-0.00000 <br />+/-0.00000 <br />+/-0.00000 <br />Criteria:+/ <br />(T`"�Y `p"S L 11y4 <br />11a,.n.11.y.,lAv x.mo. <br />xz`, ,II�,��„�i1 ,YytiJl <br />ii.l zhilRli � }\OFA, <br />00 <br />—t 1 <br />� II <br />N <br />°c.,.',`v <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />WO: 2326766 <br />