Laserfiche WebLink
RECEIVED <br />FEB 18 2016 <br />SWRCB, January 2002 Page 2 of 2 <br />5. SECONDARY PIPE TESTING ENVIRONM NIAL <br />Test Method Developed By: MAI Piping Manufacturer P7 Industry Standard M, Pro ld&%TFO ReFrO=Krr <br />F Other (Specify) <br />Test Method Used By: r7i Pressure F vacuum r7l Hydrostatic <br />Other (Specify) <br />Test Equipment Used: gauge Equipment Resolution: .20 <br />N", <br />Piping Material: <br />Z <br />Piping Manufacturer: <br />dw flex <br />dw flex <br />Piping Diameter: <br />environ <br />environ <br />in. <br />in. <br />Length of Piping Run: <br />2 in. <br />2 in. <br />ft. <br />Product Stored: <br />130 ft. <br />130 ft. <br />Method and location of <br />PREMIUM <br />PREMIUM <br />stp sump <br />stp sump <br />piping -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />min <br />min <br />starting test: <br />5 min <br />5 min <br />Test Start Time: <br />Initial Reading (RI): <br />11:20:00 <br />11:20:00 <br />Test End Time: <br />5.00000 PSI <br />5.00000 PSI <br />Final Reading (RF): <br />12:20:00 <br />12:20:00 <br />Test Duration: <br />5.00000 PSI <br />5.00000 PSI <br />Change in Reading (RF -R,): <br />I hr <br />I hr <br />Pass/Fail Threshold or <br />0.00000 PSI <br />0.00000 PSI <br />+/-0.00000 <br />+/-0.00000 <br />Criteria: <br />1,11 , m N <br />�110 N <br />5 <br />5th u' <br />Pix lW <br />M-111 4r <br />2 <br />M <br />"a 4, <br />00 <br />W] <br />'1 <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />WO: 2326766 <br />