Laserfiche WebLink
Page 8 of 8 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑ Spill Bucket Manufacturer ®Industry Standard ❑ Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: <br /> Spill Box# 87 fill Spill Box# 91 fill Spill Box#87 vapor Spill Box#91 vapor <br /> Bucket IDiameter&Brand: 12" 12" 12" 12" <br /> Bucket Depth: 14" 13.5" 15" 15.5" <br /> Wait time between applying <br /> pressure/vacuum/water and 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> starting test: <br /> Test Start Time: 10:24am 10:24am 10:44am 10:44am <br /> Initial Reading(Ri): 1.4017 1.3844 0.7040 0.8254 <br /> Test End Time: 10:39am 10:39am 10:59am 10:59am <br /> Final Reading(RF): 1.4011 1.3844 0.7038 0.8244 <br /> Test Duration: 15 min 15 min 15 min 15 min <br /> Change in Reading(RF-Rj): 0.00056 0.00003 0.00021 0.00107 <br /> Pass/Fail Threshold or 0.002 0.002 0.002 0.002 <br /> Criteria: <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />