My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
755
>
2300 - Underground Storage Tank Program
>
PR0508090
>
COMPLIANCE INFO_2007-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 9:01:09 AM
Creation date
6/23/2020 6:58:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2013
RECORD_ID
PR0508090
PE
2361
FACILITY_ID
FA0007938
FACILITY_NAME
CHEVRON #208117**
STREET_NUMBER
755
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
24202029
CURRENT_STATUS
01
SITE_LOCATION
755 S TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508090_755 S TRACY_2007-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
560
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevron Monitoring Certification Checklist <br /> Store Number: 208117 Address: 755 S.TRACY BLVD TRACY,CA 95376 <br /> F <br /> Date:2/27/2013 Technician: Steven Willems Company:TANKNOLOGY INC. j <br /> Tangy 1-PREMIUM Tank 2-REGULA I <br /> Product 1 2 <br /> Tank Type <br /> (DW FRP,DW Steel,SW FRP) Fiberglass Fiberglass <br /> Tank Diameter 117.75 117.75 <br /> Annular Riser Height(measured) 78.50 77.50 <br /> Required(calculated)annular sensor length <br /> FRP tanks-see Note 1 below 184.87 184.87 <br /> Steel tanks-see Note 2 <br /> Is req'd annular sensor length marked with tape& <br /> labeled with dimension Y Y <br /> (Y/N,document w/photo)? <br /> Actual(measured)annular sensor length <br /> 248.00 271.00 <br /> (to marked point) <br /> Are the DW pipe boots pulled back in tank sumps? <br /> (YIN or N/A,note if can't be verified because clamshell is Y Y <br /> pointing down) <br /> Are tank sump sensors back in their holders and in the <br /> correct position? Y Y <br /> (YIN or N/A document with photo) <br /> _ (Y/N) Comments <br /> Has the Veeder Root Battery been replaced prior to failsafe? �� <br /> Has Veeder Root Programming before&after testing been verified? y <br /> (especially tank manifolding setup-see Note 3) <br /> Has Veeder Root Programming before&after testing been attached to the Y <br /> Work Order? <br /> € <br /> Are gasoline spin on-filters replaced during testing for ethanol per <br /> Chevron requirements n/a <br /> (Cim Tek 300MB-10 or 400MB-10 or PetroClear 40510-A only) <br /> Have all alarms generated during testing been noted in the station Alarm y <br /> Log?(YIN) <br /> Additional Comments: <br /> Note 1: DW FRP Tank Annular Calculations Note 2: DW Steel Tank Annular Calculation <br /> (circumference) <br /> X=tank diameter+Riser Height <br /> X=(3.14 x tank diam/2)+riser height <br /> 10'diameter €X=188"+riser <br /> B'diameter I X=151"+riser <br /> 6'diameter X=113"+riser <br /> Note 3:Certain Veeder Root Software versions will automatically revert to the default tank manifold settings anytime the programming is changed,such as when <br /> sensors are temporarily X'ed out,etc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.