Laserfiche WebLink
4� Tanknology <br /> Emergency Stop ( -Stop / ESO) Periodic Inspection <br /> Facility infation" On ti an <br /> Site#:208117 Date:2/27/2013 <br /> Address:755 S.TRACY BLVD Name:Steven Willems <br /> City/State:TRACY CA Technician Signature: <br /> The objective of this test is to provide assurance that the when the E-Stop switch is activated,all the fueling system circuits(turbines,and <br /> dispensers)are de-energized,and remain de-energized until they are re-set manually).The test procedures and guidelines shall be in accordance <br /> with the E-Stop Testing Process. <br /> ra1TE DA7A <br /> 1 Number of E-Stop switches INSIDE of the building: 1 <br /> 2 Number of E-Stop switches OUTSIDE of the building: 3 <br /> PEftFlRtNANC£CtA7A ^fes NsaWAS <br /> 3 You have added or confirmed that all E-Stop locations are on the Site Diagram ro r r <br /> 4 Do all E-Stops shutdown power to ALL DISPENSERS ro r r <br /> 5 Do all E-Stops shutdown power to ALL STP's ro r tr <br /> 6 Are ALL E-Stops clearly Labeled ro r r <br /> 7 Are the TURBINE BREAKERS clearly identified/labeled ro r r <br /> Fi'3ST TEST <br /> 8 All equipment secured and any access ports, lids,enclosures are closed. r r t <br /> 9 All safety barricades and test equipment has been properly removed r* r r <br /> 10 E-Stop was reset and all dispensing functions are normal re r r <br /> E-Stop Inspection Results <br /> 11 PASS I FAIL I INCONCLUSIVE <br /> Coname is learty da scribe any de lciarlcies fuV <br /> WO:2309193 <br />