Laserfiche WebLink
5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer Q✓ Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ✓❑Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: PSI <br /> 7Fiberglass <br /> n#87 Piping Run#91 Piping Run# Piping Run# <br /> Piping Material: Fiberglass <br /> Piping Manufacturer: Smith <br /> Piping Diameter: 3" <br /> Length of Piping Run: - Appx 200' Appx 200' <br /> Product Stored: 87 91 <br /> Method and location of Test Boot in Sump Test Boot in Sump Test Boot in Sump Test Boot in Sump <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 minutes 15 minutes 15 minutes <br /> starting test: <br /> Test Start Time: 8:53am 8:53am <br /> Initial Reading(RI): 5 PSI 5 PSI PSI PSI <br /> Test End Time: 9:53am 9:53am <br /> Final Reading(RF): 5 PSI 5 PSI PSI PSI <br /> Test Duration: 1 hour 1 hour 1 hour 1 hour <br /> Change in Reading(RF-RI): 0 0 <br /> Pass/Fail Threshold or 0 0 0 0 <br /> Criteria: <br /> Test Result: ❑✓ Pass ❑Fail ❑✓Pass ❑Fail []Pass ❑Fail ❑Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />