My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2014-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
755
>
2300 - Underground Storage Tank Program
>
PR0508090
>
COMPLIANCE INFO_2014-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 9:06:08 AM
Creation date
6/23/2020 6:58:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014-2017
RECORD_ID
PR0508090
PE
2361
FACILITY_ID
FA0007938
FACILITY_NAME
CHEVRON #208117**
STREET_NUMBER
755
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
24202029
CURRENT_STATUS
01
SITE_LOCATION
755 S TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508090_755 S TRACY_2014-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
332
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑✓ Industry Standard ❑ Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ✓❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: Inches <br /> Sump# 87 Sump# 91 Sump# Sump# <br /> Sump Diameter: 48" 48" <br /> Sump Depth: 78" 78" <br /> Sump Material: Fiberglass Fiberglass <br /> Height from Tank Top to Top of 12" 12" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 25" 27" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Fair Fair Fair Fair <br /> Portion of Sump Tested' Above highest penetration Above highest penetration Above highest penetration Above highest penetration <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes []No ❑✓NA Oyes ❑No ✓❑NA ❑Yes❑ No ❑✓NA El yes Flo 04A <br /> product and water)?* <br /> Turbine shutdown response time N/A N/A I N/A I N/A <br /> Is system programmed for fail-safe <br /> [:]Yes Yes []No ❑✓ ❑ ❑✓NA Oyes No NA ❑Yes❑ No M NA ❑ [:]No ❑✓ <br /> Yes No NA <br /> ai f <br /> Was ail-safe verified to be <br /> o as sa?` Oyes ONO ❑✓NA Oyes ONO ❑✓NA [:]Yes []No [✓NA [IYes [:]No ❑✓NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 minutes 15 minutes 15 minutes 15 minutes <br /> test: <br /> Test Start Time: 10:54am 10:53am <br /> Initial Reading(RI): 4.18182 Inches 0.98256 Inches Inches Inches <br /> Test End Time: 11:09am 11:08am <br /> Final Reading(RF): 4.18163 Inches 0.98259 Inches Inches Inches <br /> Test Duration: 15 mins 15 mins 15 mins 15 mins <br /> Change in Reading(RF-R): 0.00019 0.00003 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> Test Result: ❑✓ Pass []Fail ❑✓ Pass ❑Fail ❑Pass ❑Fail El Pass ❑Fail <br /> Was sensor removed for testing? (Z]Yes []No []NA ❑✓Yes []No ❑NA ❑✓ Yes []NO ❑NA ❑✓ Yes ❑No ❑NA <br /> Was sensor properly replaced and <br /> verified functional aftertestin ? QYes []No ❑NA Yes []No E]NA DYes ❑No []NA Yes []No ❑NA <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.