Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer ✓❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ❑Hydrostatic <br /> ❑✓ Other(Spec) inches-1 hr visual test <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: xhea-l hr visual leg <br /> Spill Box#87 FB Spill Box#91 FB Spill Box#87 VB Spill Box#91 VB <br /> Bucket Diameter: 12" 12" 12" 12" <br /> Bucket Depth: 12.5" 12.5" 14" 14" <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 minutes 15 minutes 15 minutes <br /> starting test: <br /> Test Start Time: 8:39am 8:46am 8:39am 8:46am <br /> Initial Reading(RI): 11.5 in�es-Ihr viwal fast 11.75 ih=h.-ihrviausite 13.25 13.375 ^Wes-lhr vis a <br /> Test End Time: 9:39am 9:46am 9:39am 9:46 <br /> Final Reading(RF): 11.5 lh=has-,hr vlwal taal 11.75 10.-i hr visual teat 13.25 ^hes-1hr sua es 13.375 in&w-,hr mud li <br /> Test Duration: 1 hr 1 hr 1 hr 1 hr <br /> Change in Reading(RF-RI): 0 0 0 0 <br /> Pass/Fail Threshold or 0 0 0 0 <br /> Criteria: <br /> Test Result: ❑✓ Pass ❑Fail [DPass ❑Fail ❑✓ Pass ❑Fail Q✓ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 87 & 91 fill buckets - replaced lower o'rings <br />