Laserfiche WebLink
F.In-Tank Gauging/SIR Equipment: Check this box if tank gauging is used only for inventory control. <br /> Check this box if no tank gauging or SIR equipment i1111EGE <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: M2 0 q 5 <br /> • Yes No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? i <br /> <+ Yes r No* Were all tank gauging probes visually inspected for damage and residue buildup? E <br /> Yes r No* Was accuracy of system product level readings tested? "" °w's 7:)� -M 17Ve <br /> r. Yes r No* Was accuracy of system water level readings tested? <br /> Yes r No* ere all probes reinstalled properly? <br /> Yes No* ere all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): r Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> Yes r No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance?(Check all that <br /> N/A apply)Simulated leak rater 3 g.p.h.; r 0.1 g.p.h; 0.2 g.p.h. <br /> e> Yes r No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> o; Yes = No* Was the testing apparatus properly calibrated? <br /> Yes + No* For mechanical LLDs,does the LLD restrict product Flow if it detects a leak? <br /> e N/A <br /> IT, Yes r No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> 4[r N/A <br /> e Yes r No* For electronic LLDs that are programmed for positive shut down,does the turbine automatically shut off if any portion of the <br /> monitoring system is disabled or disconnected? <br /> o Yes No* For electronic LLDs that are programmed for positive shut down,does the turbine automatically shut off if any portion of the <br /> N/A monitoring system malfunctions or fails a test? <br /> o Yes r No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> «7 N/A <br /> •, Yes r No* ere all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 12/07 <br />