My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2014-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
755
>
2300 - Underground Storage Tank Program
>
PR0508090
>
COMPLIANCE INFO_2014-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 9:06:08 AM
Creation date
6/23/2020 6:58:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014-2017
RECORD_ID
PR0508090
PE
2361
FACILITY_ID
FA0007938
FACILITY_NAME
CHEVRON #208117**
STREET_NUMBER
755
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
24202029
CURRENT_STATUS
01
SITE_LOCATION
755 S TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508090_755 S TRACY_2014-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
332
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Feb, 23. 2015 12: 36PM No, 5149 P. 4 <br /> page�of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer ® Industry Standard ❑Professional Engineer <br /> D Other(Specify) <br /> Test Method Used: ®Pressure ❑ vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: <br /> Piping Run# ea 7 piping Run# Piping Run# Piping stun# <br /> Piping Material: x jl ' <br /> Piping Manuufacturer: V CLI <br /> Piping Diameter: 3 <br /> Length of Piping Run: J 5J " v e <br /> Product Stored: <br /> Method and location of � � id r.s� a��nnnt� <br /> pipi -run isolation: <br /> Wait time between applying 30 mutes 30 minutes 30 minutes 30 minutes <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: ; y 7 <br /> Initial Reading(R): 5 psi 5 psi psi psi <br /> Test End Time: 10.1 7 a e 4 7 <br /> Final Reading(Rr): $ psipsi psi psi <br /> Test Duration: 1 hour 1 hour 1 hour 1 hour <br /> Change in Reading(1ZP-R,): 0 � <br /> Pass/Fail Threshold or 0.00 0.00 0.00 0.00 <br /> Criteria: <br /> Test Result: ® Pass ❑Tail N Pass ❑Fail ❑ Pass ❑Fail El Pass <br /> ❑Fail <br /> COMMCOU— (include information on repairs made prior-ro resling, and r•econrmended follow up for failed tests) <br /> Received Time Feb, 23. 2015 12:46PM No, 8183 <br />
The URL can be used to link to this page
Your browser does not support the video tag.