My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2014-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
755
>
2300 - Underground Storage Tank Program
>
PR0508090
>
COMPLIANCE INFO_2014-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 9:06:08 AM
Creation date
6/23/2020 6:58:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014-2017
RECORD_ID
PR0508090
PE
2361
FACILITY_ID
FA0007938
FACILITY_NAME
CHEVRON #208117**
STREET_NUMBER
755
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
24202029
CURRENT_STATUS
01
SITE_LOCATION
755 S TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508090_755 S TRACY_2014-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
332
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Feb. 2 2015 12: 36PM No. 5149 P. 5 <br /> Page'3 of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer Industry Standard ❑Professional Engineer <br /> ❑ Other(specify) <br /> Test Method Used: ❑Pressure ❑'V'acuum ®Hydrostatic <br /> ❑ Other(Speci) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: <br /> Sump# 1 Sump ff 9/ Sump# Sump#i` <br /> Sump Diameter: Al T <br /> Sump Depth: rJ <br /> Sump Material&Manufacturer: ' '' <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: / / <br /> Height from Tank Top to Lowest IMUNIVIENM <br /> Electrical penetration: 2 7 IIIA d 119PAPTAXNT <br /> Condition of sump prior to testing: U k <br /> Portion of Sump Tested' Above <br /> highest Above <br /> etihighest penetrationove penetration Above highest <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes❑No®NA ❑Yes❑No®NA ❑Yes❑No®NA ❑Yes❑No®NA <br /> product and water)?` <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe <br /> shutdown?* El Yes[-]No®NA [-]Yes[71No NA [-]YesE]No®NA [_1 Yes❑No®NA <br /> Was fail-safe verified to be <br /> operational?* ❑Yes❑No®NA [-]Yes❑No®NA ❑'Yes❑No 2]NA ❑Yes❑No®NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 30 minutes 30 minutes 30 minutes 30 minutes <br /> test: <br /> Test Start Time: <br /> Initial Reading(Rj): �. 9/63 2. yr7 <br /> Test End Time: /p.• V7 .D <br /> Final Reading(RP): 3_ g G z 2 _ 9 z.y <br /> Test Duration: 15 min 15 min 15 min 15 nein <br /> Change in Reading(RP-R& e?vv/j O f7 U <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> Test Result:. 0 ]Pass ❑Fait X1 Pass ❑Fail.- [l Pass '®]Fail <br /> ❑;Pass ❑Fail <br /> Was sensor removed for testing? Yes❑No❑NA Eyes❑No❑NA ®Yes❑No❑NA ®Yes❑No❑NA <br /> Was sensor properly replaced and 5C.Yes ElNo ElNA XYes❑No❑NA ®Yes[I No[jNA ®Yes ElNo❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prion to testing and recommended follow-up fo,•failed Pests) <br /> t If the entire depth of the sump is not tested,specify how much was tested. If the answer to a of the questions indicated with an <br /> asterisk C"1 is"NO"or"NA",the entire sumn must he tested. (See SWRCB LG-160) <br /> Received Time Feb. 23. 2015 12:46PM No. 8183 <br />
The URL can be used to link to this page
Your browser does not support the video tag.