Laserfiche WebLink
o <br />' S WRCB; January 2002 <br />Test Method Developed By: <br />Test Method Used: <br />5. SECONDARY PIPE TESTING <br />Piping Manufacturer 0 Industry Standard <br />essure�;4 0 Vacuum <br />0 Other (Spec) <br />Page -�; of 8 <br />0 Professional Engineer <br />0 Hydrostatic <br />Test Equipment Used: Pta 5 S v, 2 (,.-C,, O"e s "✓t ty S --T 14✓p etre <br />Piping Run #j- Piping Run # 2- <br />Piping Material: Fd 6w. l4 s <br />Equipment Resolution: -/// <br />Piping Run # Piping Run # <br />Piping Manufacturer: <br />Piping Diameter: i <br />Length of Piping Run: °3 r,ox .. to <br />A t: ov, , 7 -lot <br />Product Stored: (dt ✓ <br />5"u ct 1 <br />f <br />Method and location of e, 4-1-4- <br />i in -run isolation: <br />piping -run <br />-T-;!-'s4- hoe) 4- 04 - <br />u p 6-9- 3 <br />Wait time between applying <br />ressure acuum/water and <br />s m test: L I„o <br />l L.ou,v <br />Test Start Time: `� ' <br />q ' q <br />Initial Reading (RI): %�5S <br />/0� " <br />Test End Time:re-- <br />Final Reading (RF): f 5 <br />y <br />Test Duration: G t, y 3. <br />OL v <br />C <br />Change in Reading (RF -RI): ) <br />C -P P -5:r ' <br />Pass/Fail Threshold or <br />Criteria: N u L" ss ; v,r 1 5- <br />mi te,, S ja' P S. <br />Test Result: I Afass 0 Fail <br />2KPass 0 Fail <br />0 Pass O Fai <br />0 Pass 0 Fail. <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />