Laserfiche WebLink
S WRCB, January 2002 <br />6. PIPING SUMP TESTING <br />Test Method Developed By: ❑ Sump Manufacturer ❑ Industry Standard <br />❑ Other (Spec6) <br />Test Method Used: ❑ Pressure ❑ Vacuum. <br />❑ Other (Spec6) <br />Page _'f of 8 <br />Engineer <br />Test Equipment Used: , 0.1 , C' ` �,, {� ��. ` c coo <br />Equipment Resolution:, po-7- <br />w Sump # Sump # '.._ <br />s <br />Sump # �Sumg # f' <br />Sump Diameter: <br />� P! <br />Sump Depth: (� • r <br />3 <br />Sump Material: (- i 1'e"'I I e, s S <br />Height from Tank Top to Top of i I <br />`N <br />U {- (P Vqj <br />Highest Piping Penetration: ��; t t, <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to testing: 9--) r <br />p,r <br />Portion of Sump Tested' Wac4e V wily It!' <br />W af.4--r (r .w,014 <br />Does turbine shut down when <br />, <br />sump sensor detects liquid (both es ❑ No ❑ NA <br />'Yes ❑ No ❑ NA <br />❑ Yes ❑t;"I ❑ NA <br />❑ Yes } No �NA <br />product and water ?' <br />Turbine shutdown response time N6� C.{�.elc� � <br />y �c��- c.l..e.t Ict.� <br />Is system <br />shutdown?` ogrammed for fail-safe ZYes ❑ No ❑ NA <br />�es ❑ No ❑ NA <br />❑ Yes ❑ ❑ NA <br />❑ Yes ❑�-o ❑ NA <br />Was fail-safe verified to be <br />❑ Yes ANo ❑ NA <br />❑ YesNo ❑ NA <br />El Yes qNo ' ❑ NA <br />11 Yes Elko/ ❑ NA <br />o erational? <br />! <br />Wait time between mg <br />pressure/vacumep d starting <br />test: Lo r- F:.,vg <br />Test Start Time: J U S CU <br />/,' (fQ <br />t <br />Initial Reading (Rj): av5---Gnrc.Cp <br />rre"x Gel e <br />Test End Time: <br />Final Reading (RF): nrs+6,tvc <br />Test Duration: ,--VA U �. -e <br />Change in Reading (RF-Ri): <br />Pass/Fail Threshold or Criteria: r., rq, ze k -es <br />, tJas-/JO s®ate, T, <br />Test Result:. ass 0-1♦ail <br />Pass ❑ Fail <br />❑ Pass 0 Fail <br />❑ ass ❑ Fai <br />Was sensor removed for testing?es ❑ No ❑ NA <br />es ❑ No ❑ NA <br />El Yes El No ❑ NA <br />❑ es ❑ No ❑ <br />Was sensor properly replaced and s ❑ No ❑ NA <br />? <br />es ❑ No ❑ NA <br />❑Yes ❑ No ❑ NA <br />4Les ❑ No ❑ (� <br />verified functional after testin <br />Comments — (include information on repairs made prior to testing, and recommended)ollow-up for failed tests) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk(*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />