Laserfiche WebLink
'SWRCB,January 2002 Page 4 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Tank Manufacturer Industry Standard U Professional Engineer <br /> Other (Specify) <br /> Test Method Used: ❑X Pressure F Vacuum F Hydrostatic <br /> El Other (Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run# 1 DIE Piping Run# 1 DIE Piping Run# 2 DIE Piping Run# 2 DIE <br /> Piping Material: fiberglass flexline fiberglass fiberglass <br /> Piping Manufacturer: ameron W.f. ameron ameron <br /> Piping Diameter: 511 211 sit 211 <br /> Length of Piping Run: 6 0' 1201 6 0 ' 6 <br /> Product Stored: DIESEL DIESEL DIESEL DIESEL <br /> Method and location of DIESEL DIESEL DIESEL DIESEL <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5min 5min 5min 5min <br /> starting test: <br /> Test Start Time: 4 :3 0 9:12 4:3 8 5:17 <br /> Initial Reading(Rt ): 3psi 5psi 3psi 3psi <br /> Test End Time: 4:31 10:12 4 :3 9 6:17 <br /> Final Reading(RF ): 0 5PSI 0 3psi <br /> Test Duration: imin 1hr imin 1hr <br /> Change in Reading(RF-P4 ): 3psi 0 3psi 0 <br /> Pass/Fail Threshold or 0 0 0 0 <br /> Criteria: <br /> ag <br /> Niffimmim <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> with the big flow piping it seems that all three big flows end up in transition sumps <br /> but with out the blue prints i have not idea what goes where so i tested from both <br /> ends. transition sump and diesel stp sump. <br />