My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 2:47:40 PM
Creation date
6/23/2020 6:59:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008
RECORD_ID
PR0517272
PE
2361
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
01
SITE_LOCATION
15237 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\T\THORNTON\15237\PR0517272\FINAL JUDGMENT ON CONSENT 09-29-08.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'SWRCB,January 2002 Page 4 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Tank Manufacturer Industry Standard U Professional Engineer <br /> Other (Specify) <br /> Test Method Used: ❑X Pressure F Vacuum F Hydrostatic <br /> El Other (Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run# 1 DIE Piping Run# 1 DIE Piping Run# 2 DIE Piping Run# 2 DIE <br /> Piping Material: fiberglass flexline fiberglass fiberglass <br /> Piping Manufacturer: ameron W.f. ameron ameron <br /> Piping Diameter: 511 211 sit 211 <br /> Length of Piping Run: 6 0' 1201 6 0 ' 6 <br /> Product Stored: DIESEL DIESEL DIESEL DIESEL <br /> Method and location of DIESEL DIESEL DIESEL DIESEL <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5min 5min 5min 5min <br /> starting test: <br /> Test Start Time: 4 :3 0 9:12 4:3 8 5:17 <br /> Initial Reading(Rt ): 3psi 5psi 3psi 3psi <br /> Test End Time: 4:31 10:12 4 :3 9 6:17 <br /> Final Reading(RF ): 0 5PSI 0 3psi <br /> Test Duration: imin 1hr imin 1hr <br /> Change in Reading(RF-P4 ): 3psi 0 3psi 0 <br /> Pass/Fail Threshold or 0 0 0 0 <br /> Criteria: <br /> ag <br /> Niffimmim <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> with the big flow piping it seems that all three big flows end up in transition sumps <br /> but with out the blue prints i have not idea what goes where so i tested from both <br /> ends. transition sump and diesel stp sump. <br />
The URL can be used to link to this page
Your browser does not support the video tag.