Laserfiche WebLink
'SVtFRCB,January 2002 Page 5 <br /> 5. SECONDARY PIPE TESTING <br /> Test"✓Iethod Developed By: Tank Manufacturer F--­l Industry Standard Professional Engineer <br /> Other (Specify) <br /> Test Method Used: M Pressure F Vacuum F Hydrostatic <br /> Other (Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run# 3 DIE Piping Run# 3 DIE Piping Run# 4 UNL REG Piping Run# 5 PRE SUP <br /> Piping Material: fiberglass fiberglass flexline flexline <br /> Piping Manufacturer: ameron ameron w.f. w.f. <br /> Piping Diameter: 511 211 211 211 <br /> Length of Piping Run: 6 0' 6' 1201 3 0' <br /> Product Stored: DIESEL DIESEL UNLEADED PREMIUM <br /> Method and location of DIESEL DIESEL UNLEADED PREMIUM <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5min 5min 5min 5min <br /> starting test: <br /> Test Start Time: 4 :42 5:17 1:05 6:34 <br /> Initial Reading(F4 ): 3psi 3psi 5psi 5psi <br /> Test End Time: 4 :43 6:17 1-06 7:34 <br /> Final Reading(RF ): 0 3psi 0 5psi <br /> Test Duration: lmin lhr lmin lhr <br /> Change in Reading(RF-1 I ): 3psi 0 5psi 0 <br /> Pass/Fail Threshold or 0 0 0 0 <br /> Criteria: <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> with the big flow piping it seems that all three big flows end up in transition sumps <br /> but with out the blue prints i have not idea what goes where so i tested from both <br /> ends. transition sump and diesel stp sump. <br />