My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 2:47:40 PM
Creation date
6/23/2020 6:59:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008
RECORD_ID
PR0517272
PE
2361
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
01
SITE_LOCATION
15237 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\T\THORNTON\15237\PR0517272\FINAL JUDGMENT ON CONSENT 09-29-08.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'SVtFRCB,January 2002 Page 5 <br /> 5. SECONDARY PIPE TESTING <br /> Test"✓Iethod Developed By: Tank Manufacturer F--l Industry Standard Professional Engineer <br /> Other (Specify) <br /> Test Method Used: M Pressure F Vacuum F Hydrostatic <br /> Other (Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run# 3 DIE Piping Run# 3 DIE Piping Run# 4 UNL REG Piping Run# 5 PRE SUP <br /> Piping Material: fiberglass fiberglass flexline flexline <br /> Piping Manufacturer: ameron ameron w.f. w.f. <br /> Piping Diameter: 511 211 211 211 <br /> Length of Piping Run: 6 0' 6' 1201 3 0' <br /> Product Stored: DIESEL DIESEL UNLEADED PREMIUM <br /> Method and location of DIESEL DIESEL UNLEADED PREMIUM <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5min 5min 5min 5min <br /> starting test: <br /> Test Start Time: 4 :42 5:17 1:05 6:34 <br /> Initial Reading(F4 ): 3psi 3psi 5psi 5psi <br /> Test End Time: 4 :43 6:17 1-06 7:34 <br /> Final Reading(RF ): 0 3psi 0 5psi <br /> Test Duration: lmin lhr lmin lhr <br /> Change in Reading(RF-1 I ): 3psi 0 5psi 0 <br /> Pass/Fail Threshold or 0 0 0 0 <br /> Criteria: <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> with the big flow piping it seems that all three big flows end up in transition sumps <br /> but with out the blue prints i have not idea what goes where so i tested from both <br /> ends. transition sump and diesel stp sump. <br />
The URL can be used to link to this page
Your browser does not support the video tag.