Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Spec) <br /> TestEquipment Used: Incon Incon TS-STS Tester Equipment Resolution: +/-0.002" <br /> Sump# STP 1 87 Sump# STP 2 87 Sump# STP 3 87 Sump# STP 4 87 <br /> Sump Diameter: 42" 42" 42" 42" <br /> Sump Depth: 55" 55" 55" 55" <br /> Sump Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 14" 16" 17" 33" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 8" 8" 12" 8" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry <br /> Portion of Sump Tested' 19" Unable to test Unable to test 22" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes []No ®NA ❑Yes ❑No ®NA ❑Yes ❑No K NA ❑Yes ❑No X NA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe ❑Yes '--]No k NA []Yes ❑No ®NA ❑Yes ❑No 1K NA ❑Yes ❑No ®NA <br /> shutdown?* <br /> Was fail-safe verified to be ❑Yes ❑No k NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 minutes 15 minutes <br /> test: <br /> Test Start Time: 1:19pm 1:36pm 12:00pm 12:34pm <br /> Initial Reading(RI): 6.8981" 6.8974" 4.2571" 4.2633" <br /> Test End Time: 1:34pm 1:51 pm 12:15pm 12:50pm <br /> Final Reading(RF): 6.8975" 6.8973" 4.2569" 4.2638" <br /> Test Duration: 15 Minutes Each (30) 15 Minutes Each (30) <br /> Change in Reading(RF-RI): -0.0006 -0.0001 -0.0002 0.0005 <br /> Pass/Fail Threshold or Criteria: +/-0.002" 1 +/-0.002" +/-0.002" 1 +/-0.002" <br /> Test Result: 9 Pass 0 Fail 0 Pass ®Fail ❑ Pass; ®Fail M Pass 0 Fail <br /> Was sensor removed for testing? k Yes []No [INA ❑Yes ElNo 9 NA ElYes ❑No ®NA 9 Yes ElNo L1 NA <br /> Was sensor properly replacedLand k Yes ❑No 11NA 11Yes 11No 9 NA ❑Yes D.No ®NA ®Yes 11No ❑NA <br /> verified functional after testin <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> . Unable to test STP 2 due to a 2" missing boot. <br /> * Unable to test STP 3 due to a defective electrical boot 3"x1.5" <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />