My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_2011-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:44 AM
Creation date
6/23/2020 6:59:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2013
RECORD_ID
PR0517272
PE
2361
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
01
SITE_LOCATION
15237 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0517272_15237 N THORNTON_2011-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer 9 Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Incon Incon TS-STS Tester Equipment Resolution: +/-0.002" <br /> Sump# STP 5 91 Sump# D-Tsump Sump# Sump# <br /> Sump Diameter: 42" 42" <br /> Sump Depth: 55" 60" <br /> Sump Material: Fiberglass Fiberglass <br /> Height from Tank Top to Top of 4" 16" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 10" 20" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry <br /> Portion of Sump Tested' Unable to test 24" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No IRI NA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe ❑Yes ❑No R NA []Yes ❑No ®NA ❑Yes ❑No 9 NA ❑Yes ❑No X NA <br /> shutdown?* <br /> Was fail-safe verified to be ❑Yes ❑No Ik NA ❑Yes ❑No 9 NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 minutes <br /> test: <br /> Test Start Time: 1:19pm 1:36pm <br /> Initial Reading(RI): 6.8981" 5.5043" <br /> Test End Time: 1:34pm 1:51 pm <br /> Final Reading(RF): 6.8975" 1 5.5043" <br /> Test Duration: 15 Minutes Each (30 <br /> Change in Reading(RF-RI): -0.0006 0.0000 <br /> Pass/Fail Threshold or Criteria: +/-0.002" +/-0.002 <br /> Test Result; ❑ Pass ❑Fail 19 Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? ❑Yes []No ®NA ®Yes ❑No ❑NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA <br /> Was sensor properly replaced and ❑Yes []No It NA 9 Yes ❑No ❑NA ❑Yes ❑No ®NA ❑Yes ❑No X NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> * Unable to test STP 5 91 Unleaded due to a bad penetration boot. <br /> 'If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.