My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_2013-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:44 AM
Creation date
6/23/2020 6:59:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2016
RECORD_ID
PR0517272
PE
2361
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
01
SITE_LOCATION
15237 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0517272_15237 N THORNTON_2013-2016.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
331
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />I* A ---,v-1 <br />■ <br />Dimensions <br />A_ B <br />3.0" 5.6" <br />Weiaht <br />1.3 lbs. <br />Body, cast aluminum for <br />light weight vapor path <br />All Seals, constructed <br />Viton® and Buna-N ma <br />Vapor Path, designed <br />with low pressure drop <br />Dual Poppet Design, <br />off the fuel and vapor r <br />Shear Pins, constructs <br />aluminum to fracture a1 <br />maximum pull force of <br />o <br />Scutt Guard, constructed <br />of vinyl material Vitone is a registered trademark <br />of DuPont Dow Elastomers. <br />Guide Saecification: The Model A4119EVR Coaxial Safe Break Valve is a shear pin style non- <br />reconnectable component designed for use with Balance Phase II Vapor Recovery Systems. <br />Complies with the California Air Resources Board CARB Enhanced Vapor Recovery Program <br />EVR Certification Procedures CP -201. A dual poppet design seals off both the fuel and vapor <br />paths upon separation due to customer related "drive -off' occurrences, eliminating fuel spillage, <br />vapor emissions and minimizing damage to the dispenser unit. <br />Model Numbers Descri tp ion <br />A4119EVR-020 Coaxial Safe Break Valve <br />Repair Kit <br />494748EVR 'Fuel Path O-ring Kit <br />Performance Standards & Specifications <br />These components are factory tested to, and meet <br />the following specifications: <br />1. Meets ARB Material Compatibility with Fuel <br />Blends as per Section 3.8 of CP -201. <br />2. TP -201.2B — Complies with the maximum <br />allowable leak rate of 0.00 CFH @ 2.00 inches <br />of water column pressure. <br />Certification & Listings: <br />Agency Approval Number <br />CARB Pre-EVR <br />Approval Letter #95-3 <br />CARB EVR <br />Executive Orders VR -203, VR -204, <br />VR -207, VR -208 <br />CARB Pre-EVR Mix & Match <br />Approval Letter #09-10/ <br />Advisory #408 9/19/2010 <br />California State Fire Marshall <br />GVRC 005:007:031 <br />California Division of Measurement Standards <br />3211(d)-09 <br />3. TP -201.2J — Complies with the maximum UL Listing <br />allowable component pressure drop of 0.04 MH17833, Volume 1, 08NK20256 <br />inches of water column @ 60 CFH. <br />Emco Wheaton Retail Corporation <br />2300 Industrial Park Drive • Wilson, North Carolina 27893 N-1005 <br />252-243-0150 • 252-243-4603 (fax) • www.emcoretail.com 09/11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.