Laserfiche WebLink
SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: ❑ Piping Manufacturer <br />❑ Other (Spec) <br />Test Method Used: X Pressure <br />❑ Other (Spec) <br />Test Equipment Used: Analog Gauge <br />EMEMEMM <br />Piping Run # T1toT2 <br />Pip <br />Piping Material: <br />Fiberglass <br />Fibe <br />Piping Manufacturer: <br />Ameron <br />AME <br />Piping Diameter: <br />2" <br />2' <br />Length of Piping Run: <br />25' <br />25' <br />Product Stored: <br />87 unleaded <br />87 u <br />Method and location of <br />isolation: <br />STP 1 to STP 2 <br />STP <br />-piping-run <br />Wait time between applying <br />pressure/vacuum/water and <br />test: <br />15 minutes <br />Una <br />-starting <br />Test Start Time: <br />8:30am <br />87 Unleaded <br />Initial Reading (RI): <br />5.00 psi <br />STP 2 to UDCs <br />Test End Time: <br />9:30am <br />Final Reading (RF): <br />5.00 psi <br />8:55am <br />Test Duration: <br />1 hour <br />Change in Reading (RF -RI): <br />0.00 psi <br />Pass/Fail Threshold or <br />Criteria: <br />0.00 psi <br />Page of <br />® Industry Standard <br />❑ Professional Engineer <br />❑ Vacuum <br />❑ Hydrostatic <br />Equipment Resolution: +/-0.25 <br />Run # T2toT3 <br />Piping Run # T3toT4 <br />Piping Run # 87Main <br />ass <br />Fiberglass <br />Plastic <br />i <br />Ameron <br />OPW <br />2" <br />2" <br />25' <br />300' <br />aded <br />87 unleaded <br />87 Unleaded <br />o STP 3 <br />STP 3 to STP 4 <br />STP 2 to UDCs <br />to test line <br />15 minutes <br />Unable to test line <br />8:55am <br />5.00 psi <br />9:55am <br />5.00 psi <br />1 hour <br />0.00 psi <br />0.00 psi <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />* Unable to test STP 2 to STP 3 Siphon line due to a missing 2" secondary boot. <br />* Unable to test 87 main secondary lines due to missing boots on dispensers. <br />