SITE PLAN SALE:)'-20'-0• _ TANK INSTALLATION NOTES GENERAL ELECTRICAL NO
<br /> dISTAl.500 GALLON MODEM WEUwdO-ENvoto 16 DOUBLE WALL sTin COMPOSITE TAR(.TANK TO 9E SET 46'AnNatuM
<br /> ® SECOND1STREEr BELE/FORM GRADE.CONTRACTOR 70 FED DETERMINE EXACT Mm,'DEPTH.BACIOML WITH CLEAN WASHED,SHO. 1. �NDERGROUND PIPING A,CONOM AFTER A
<br /> !KR OR C TO
<br /> THE FOLLOWING REQUIREMENTS BE AN r CONCRETE TANK SUB WNM f 4 O 12 BOTH WAYS SET wwou:c6VERS 3'ABOVE VE OUTER EDGE:ARE TO BE MET: If Slae. (SEE TAW SECTION) 2.ALL CONgxTS TO HAVE SEK-OFFS PER LATEST EDITOR OF THE
<br /> NATIONAL ELECTRIC CODE ALL JI-BOXES To BE EXPLOSION PROOF..
<br /> a 72 HgRI NOTIFICATION 1TION PRIOR TO TANK INSTAILAMK D,3 Nnum SPACE witoon. (MANNIGKE COYEt To BE LOCKABLE h wATERvI HL SEE TANK secilm) DIM -2 OR CROUSE-HODS GRI SERBS.
<br /> b.TANK SWIMS 70 SE NSPEM BY CUFA
<br /> AT(3)THREE SEPARATE KOtSLRuenoN PW S: ®F'FILL (WMOLE COVER 70 SE WATERTIGHT.SEE TAN(SECTION) A USE CABLE CONNECTOR MM(CROUSE-FIDS CO OR
<br /> I.TAN(R PRIMARY PIPING MDROSIATICALLY OREQIWJAEI(T)AT YDMtOR!LEVEL GAUGE CAME OONECIIOi6 To
<br /> PHEIAUJTG ALLY TESTED FOR 30 MINUTES. Os 4'VENT RISER. (MANHOLE COVER 70 BE ODER IGHL SEE TANK SEC110N) J-BOfFS!PPE MM N SNP BORES.
<br /> 2.INSPECTION CT ALL SECONDARY CONTAINMENT, a 4!'ELECTRONIC TANK CALKS PROBE RISER. (MAMfOLSE E COVER 70 LOCKABLE AND WAMITI G T.SFE TANK SECTION) 4 ALL UNDERGROUND CONDINiS AND CONDINIS►ISTNLED OVIDOORS 70
<br /> NCW M TESTING,N ACCORDANCEACCORDANCEWITH O BE PVC COATED Rlf;b.ALL COMM INSTALLED INSIDE BIAOM.MAY
<br /> MANUFACNRER'S GUIDELINES. 0 DOSTING OVERFILL ALARM @ OVERFILL ALARM MM TO REMAIN.ALARM SNL ACTIVATE AT BOIL TANK BE EMT(COMPRESSION TYPE lTrM OLTP.
<br /> 3.FINAL INSPECTION.NCWDNG ALL PORDOS OF CAPAnM.
<br /> THE LEAK DEnEM SYSKELL 0 OUSTING VEEDER_RDOT 11$�=PLUS TANK MOITORING PANEL To REMAIN.EISfNG POWER ARD CMW.W.A7M COMM 5.CONTRACTOR To PROVIDE d INSTAL PULL=05 AS REQUIRED TO
<br /> Q TANK SMIEIY NIEDROY TESTS FORWARDED Q APPROVED 10 REMAIN. FACRRAIE WIRE PULLING
<br /> 125.00' BY CLPA PRIOR 70 TANK SYSTEM
<br /> X= X= TC R= X- X=X- - BEING PLACED N OPERAMOK D,9 V7sTALL 3/4'SUPPLY AND r RETURN visti N Film ASS FLEXIBLE FUEL LNES SLOPE 1/4'PER FOOT DOWN To TNN(. NL ALL EQUIPMENT,HARDWARE AND SYSTEM COMPONENTS MST SE
<br /> INSTALLED N STRICT GHINFOHNCE WITH MANRFACRMFR'S
<br /> aL STATE WATER FORMS(fORMAPRI R B.o AND6UL RSDS 4'SECONDARY DUCT. INSTRUCTIONS AND S ECIICAOKNS.
<br /> C� tON8LE7ED t SCTED PRIOR 10 TANK NSTNS 2'DOME WALL VENT LRE.SUPE 1/4'PER FOOT DORM 70 TANK.(SEE DENTS) 7.ALL CONDUCTORS 70 BE TNN GO OR BELDEN SBNDFD CABLE.
<br /> R ALL CONDUITS 70 3/4'UNLESS NOTED 07HERVISE
<br /> .t s.AN UNNDHDR�D RELEASE RESPONSE PLAN MST BE tt MBTALL NEW VENT BSER.(SLE DETAILS)
<br /> 1z HEXISTINCUPA
<br /> 0 8 P To TAMC O ERA7KSUBMITTED At APPROVED�. @ fO TRACTOR 70 COMPLETE AL EQUIPMENT TESTS REMM BY GOVER1,10111AL AGENCIES.
<br /> C I f.LVIOENM OF FINANCIAL.RESPONSHM SUBMITTED 71) Q ALL MANHOLES AND BOXES 7o BE INSTALLED STRAIGHT MEN-LNE,ALIO r ABOVE O TEC EDGE OF SLAB.CUIVL HAZARDOUS AREA NOTES
<br /> � WDa c „ "ONIRACTOR TO APPLY'S ALTA E'SEALANT To ALL MIS N WESTERN FIBERGLASS SEXY CONTAIMM SYSTEM AND AT
<br /> _ AGENCIES MAY FHVE ADDITIONAL ONAS OF VAULT C ONDW SLEEVE. N AN OUTSIDE UrA'noK ANY MA LP To 19'ABOVE GRADE
<br /> x=x cx �K �Q - - JREQUIREMENTS LEVEL.wNMN 5'-a'H atzoli TALLY FROM ANY TIGHT TANK FULL.PPE
<br /> 125. t®SDC CONDUIT M CONIOUCTOR MNL CONTRACTOR TD RUN ONLY(1)BEIDEN BELDFOS/83710 10OX SHIELDED GME(16 SNL BE CLASSIFIED AS A CLASS 1 DIVISION 2 HAZARDOUS AREA
<br /> F'#G MIN.)WITH 10 C0IMX CIORS N EACH CONOUT.CABLE TO CONTAIN 2 CONDUCTORS FOR EACH SENSOR ALL TANK AND THE SPFERIGL VOLUME WITHIN A 3'-O'RADIUS OF ANY TANK VENT
<br /> UNDIC VAULT SENSORS TO BE INCLUDED IN ONE(1)HOE RN FROM TANK ARFA TO TLS-350 MONITOR CONSOLE. PIPE SHALL BE CLASSIFIED AS CLASS i DIVISION i HAZARDOUS
<br /> ENLARGED SITE PLAN SCALE.1/4'-1'-0' to CONTRACTOR TO REPLACE ANY A/C PAVING DAMAGED WRING FUELING SYSTEM INSTALLATION WITH NEW a PAVING OVER a CRD. A��•AEKI s'0'RADIUS As CRASS 1 DIVISION z
<br /> N ...AWRY SEN.-CGT ALL MEIN NC PAWING. ALL ELECTRICAL.CONDUITS,Frno= ETC.N THESE AREAS SNL
<br /> KANTRACTOR TO REPLACE ANY CONCRETE mmm Dim TAMC SYSTEM INSTALLATION wri NEW coMCRETE To MATCH Damn CONFORM TO THE LATEST EDITION CT M.E.C.ARTICLE 514.
<br /> ©Ai SECTION,SLOPE,COLOR MC KOHL ELECTRICAL WIRING AND EQUIPMENT BELOW A HAZARDOUS AREA
<br /> SHALL BE RATED FOR CLASS 1 DIVISION 1.PROVIDE SEAL-OFF
<br /> 1 1®CONTRACTOR TO LOOSELY WRAP WESTERN FIBERGLASS SECONDARY WITH INSULATED 12 GAKIE COPPER WINE FROM TANK PIPING FITTINGS ON ALL MW17S MOM OR LEAVING A FMZARDWS
<br /> SJMP EXIT POINT 70 PIPING VAULT TRACER TERMINATION BOLT ATTACHMENT PER DETAIL 1 ON SHEET F4.BOTH TRACER MIRES AREA
<br /> (E)BUILDING 70 BE ATTACHED To BOLT GST IN VAULT WALL.ATTACH PLASTID SIGN INSCRIBED WITH 1'MACK LETTERS ON A WHITE
<br /> EAC2K-GROUND IN VAULT.SIGN TO READ'FUEL PIPE TRACER'. IMPORTANT NOTICE
<br /> Section 7 r- -- 3 79 DISTAL vEmm-ROOT`793490-2D8 SUMP ser"AT FLOOR ADJACENT TO PIPING WALL pENE7RATIoK APPLICABLE ONLY est�2eq mota 139 hs �H
<br /> MEN PIPING VAULT IS FDT PRESENT.
<br /> 1 IdontiTicatbn tMnba 6e issued before
<br /> a 1 4 Q (E)GENERATOR a Permit to Excavate will be valid For
<br /> ®RETAIL
<br /> WF L TANK CKW AND(2)Mxr9ss efrrh SECURITY Fir ON WALL FOR STORAGE OF TLS-350 PRM-GUIs.SEE your DigAert D Number Cal
<br /> DETAIL 5,SHEET F4.
<br /> 1 UndUndergroundSDE)AUC (E)I . 1 STORAGE Q PRWDE 3M 31 GLLO7 Prmmn M SPILL Kim 1N?NlIOER gRw =m(800-"4-2343 DCT.87375).(2)xn PER STS. Service pN(
<br /> e (j I 11 a i8
<br /> CALL:TOL FREE CALL TOL FREE
<br /> L_I__i .l ' _______ _ __ _ _ _ __ _____ ___ _ TANK REMOVAL NOTES IN ER�-'�,� IN NORTHERN CMLUTHW
<br /> 1 2-2
<br /> -- ----- - --- _ ___ ___ Two WorkIng Days Blore You D,9
<br /> L-- - ------ x----- ----- -----------------------------J ®EYCAYATE AHD REMOVE EXISTING 500 GALLON gESEI TANG AHD ASSOCIATED PIPING.REMOVE
<br /> 2 9 1418 e 0 (E) I (E)TAP CAN® CIT CONCRETE SLAB' E,�mare Note to Contractor SW1 046
<br /> CONCRETE x is ®IVMVE EXISTING LMOMMM PROWCf PIPING TO GENERATOR POM OF CONNECTION
<br /> PAD The existence ars!location a1 any CONSULTANT STAMP
<br /> (E)CHAN LINK FENCE ®RWVE EXISTING UNDERGMAID VENT PIPING AND EXISTING VENT RISER. abuctures,shows an the
<br /> se
<br /> -X -X -X -x -x -X -x -X -x -x -X - -X -X x -x -x -x -x -x -x -x -x -x -x -X -X -x - =R=x=x - ® p0 7E P TO TAW MAMA.SITE HAS AVAMAME TAP W%FOR bysearch of 9001101,10 records. Elm
<br /> ® - - - - - - - - plans we
<br /> shall ascertain the true ESS
<br /> 7.'6 USE. vertical and hafzontal location and size of P.
<br /> Unese underground utilities to be used and
<br /> shot be responsible for any danmgm to ay TOR Associates, Inc. ~«
<br /> public or private
<br /> shy'shown a not Consulting Engineers Ns oA4�m
<br /> 2860 Sunrise Blvd, Ste 206
<br /> Rancho Cordova, CA 95742
<br /> (916)635- 44
<br /> 24
<br /> (91 6)635-2606 Fax
<br /> UNDERGROUND TANK REMOVAL PROCEDURE PIPING INSTALLATION NOTES REVISIONS /AUTHORIZATIONS
<br /> 1. Contractor shall call U.SA.and have utilittes field marked 12.Shore the edge of the tank hole,H required. All ehorIng is 19.If sxcawtlon Is left open overnight,Contractor to completely In-MDE(S: nND x, avcmV pPh _ seezes/AmeaaMe an e
<br /> prior to any excavation. In addition,Contractor shall make to be In place before excavating tank fence off the tank hole with six(6)foot high temporary chats - NAysp ,
<br /> visual and magnetic Inspection of work area for any possible IInk fencing,no exceptkxhs. A lockable gate Moll be provided an an a/4N
<br /> underground utilities and conduits.Contractor Is responsible for 13.Dig down to the tap of the tank exaxrvotlons left open more than 2 days.See.plans for location. WALL ALL PiPllk PER MN8IFACTURER'S MINIMUM BEND RADIUS AND ALL OTHER MANUFACTURER'S INSTAL ATI N
<br /> restoring any underground utilities damaged during construction. SPECIFV ATxRS.CONTIWIDR SHALL AIR PRESSURE TEST ALL PRIMARY&SECONDARY PPING PRIOR To BACIOiL.I.ING OR
<br /> 14.Remove the fill(drop)tube and TLS probe. Disconnect the 20.Upon approval of SBC Facility Engineer and SBC Environmental CDNNEGTNG TO TANKS AND GENERATORS.ISOLATE AND CAP ALL PlNNBY PIPING PINS R pRESSXNZE TD 75 P.S.I.(MNL)
<br /> 2.Notify SBC Facilities Engineer. Site fill,gauge.and product and vent(knee. Cap or plug open Manager.Contractor Mall Instill new tank FOR 30 MNil/TES(MN.),OR LONGER AS REQUIRED BY LOCAs.AGENCY.SOAP LEST ALL J(x1R5 AND INSPECT FOR TEAKS
<br /> Contact-and U.S.A.forty-eight ends of the Rhes which are not to be used further.Remove any REPAIR ANY LEAKS DISCOVERED AS REWNED SES PIPING 7o BE AN TESTED AFTER CONNECTION IN CONTAINMENT
<br /> (48)hours prior to stat of tank removal or any excavation. remaining liquid from the delivery Ilene using core to avoid 21.Replace or restore any existing site condition damaged or SHIP ANIO N BUILDING PIPE 7REPK21 AT 3 P.S.I.(DIN.)lb S P.S.I.(MAX)FOR 311 MNN/TES(IOL) OR RANGER AS REWNED
<br /> spillage. altered during the tank removal and installation,remove Meet PROPRIETARY SBC INFORMATION
<br /> 3.Close a4 conditioning Inlets sab)eet to fumes prior to work Nle BY LOCM AGENCY.SOAP TEST ALL CONNECTIONS AND JIM AND FOR LEAKS REPAIR ANY LEAKS DISCOVERED AS NOT FOR
<br /> p !F REQUIRED.MAINTAIN THE AER TEST ON THE SECONDARY CONTAINMENT PIPING WRING THE BVYOILND PROCESS ND VERIFY f OR DISCLOSURE OUTSIDE OF SBC
<br /> 4.Fuel In existingunderground tank Mall be removed and dT 15.Plug all flank openings with one plug to haw 1/8 InM vent THAT-PREF DROP OCCURRED N THE SECONDARY PIPING.INSPECT FOR LEAS.REPAIR ANY YAKS DISCOVERED.AEB6 - THIS RIORMATNON MAY ONLY BE USED BY ARFDR�D OF
<br /> disposed hold for tenperoture expansion. 22AN water and tests shall hove results submitted to the PIPS PINS.BOTH P Ry AND SECONDARY PIPING BMW TO BE REMSTED THE LOCAL GOVERNMENT AGENCY N CONNECTION WITH APPLICATION FOR
<br /> of by SBC Contractor.Controetor shall furnish fuel disposal environmental management department of SBC within 24 hours PROCEIMES.THE TESTING O THE PRIMARY AND SECONDARY PIPING MUST DE WITNESSED BY ENVIRONMENUL MANAGEMENT PUM AND AUTHORIZATIONS FOR BUILDIMA CRULTION,AND/OR
<br /> dodwmonAatlon to SBC. 16.The tank Mall be made inert by using thirty pounds of dry after the samples aro taken. AND LOCAL REGULATORY AGENCIES.AVER SUCCESSFUL.COMPLETION OF PIPING TESL.COMRW=70 pUI1 BACK REWgNG ZONING CHAISES'
<br /> Its per thousand gallons of tank capacity or as required BOOT FAIN SECONDARY PIPING N TANK SWAP TO ALLOW UMtEST1 M DRAINAGE FROM SECONDARY PIPED SYSTEM IMM THE
<br /> 5. will apply for tank removal permit.Contractor is by local authorities. CONSTANTLY MONITORED TAN(SLAP. DRAWNNCS PREPARED FOR
<br /> responsible far picking up permit,paying fees,and arranging
<br /> Inspections.NI tank and piping removal to by Contractor. 17,After tank hes been inspected by local health and fire
<br /> Contractor Mall cooperate with'Environmental Contractor for krepectors,excavate and remove tank and piping.Contractor to CORPORATE
<br /> soil/water sampling and disposal of tank load tank and piping an transport provided by others.Disposal REAL ESTATE
<br /> of tank and piping by Enviro.Contractor.Contractor to remove
<br /> TANK, P PRESSURE TFST
<br /> 8.Provide foe extinguishers of size and rating specified by and dispose of existing concrete tie-down slab beneath flank H
<br /> local fire departments. specified In Scope of Work on shest Ft. ALL NDLY INSTALLED TANKS AND TANKS REMOFTITED WITH NEW SUMPS OR NEW HARONE THAT ENTERS O EXITS A SRP ARE TO
<br /> BE N4FOSFATICALY TERM WITH A FENT OF WATER ONE FOOT ABOVE THE HIGHEST PONE OF PEETRA7KN O JOL ALIERiMiWaY, nossr ssa
<br /> 7.There shill be no welding or other sources of Ignition M the 18.Attar the existing tank is removed,sail and/or water samples SUMPS MY BE VACUUM TESTED PER MANUFACTURERS INSTRUCTIONS. ESCALON
<br /> area while the removed operations are in progress.There Moil will be taken from the tank hole by the Env4onmentcd
<br /> be no smoking on the job Bite.'NO SMOKING"signs shall be Contractor.If the soil/water samples are dean,then was
<br /> posted. Mall be disposed of by Contractor.H contamination is 1812 COLEY AVENUE
<br /> discovered,Contractor to notify SBC Environmental Manager
<br /> 8.Provide barricades with flashing yellow lights and waning immediately.Contaminated sol is to be stacked separately ESCALON, CALIFORNIA
<br /> signs to protect pedestrians and/or motor whiles from an visqueen and covered with visqueen and anchored firmly to
<br /> work arm and tank hole. prevent R from being blown off.Provide an asphalt,concrete or CLLC=ESCLCAI i UG010
<br /> sonde"berm around all dot stack piles to prevent runoff.
<br /> 9.Drain,and when appropriate,flush product In the piping Into the Disposal of contaminated soil will be under separate contract.osal contsm,Me UNDERGROUND FUEL TANK
<br /> tank Dmtraactor CCo nttrraactor shad illoaadd contam ninated smog cn truck SUCTION SYSTEM
<br /> 1o.The Rinse Contractor shall remove all remaining flammable liquid provided by Environmental Contractor.
<br /> from the tank which can be pumped out.It may be necessary TANK REMOVAL/DISTILLATION NOTES
<br /> to use a hand pump to remove the bottom few Inches of 03awom NAM -09/16/03
<br /> awe AS NOTED
<br /> product and rbnsate.All residual liquid or sludge,including
<br /> rinstate will be disposed of by Environmental Contractor. DAMN Be ON a*=or. S
<br /> ii.Sowcut and remove concrete or A.C. covet for access to
<br /> Sec AURIOFSOM SLEET: 2 OF a seas I am xxx
<br /> tank,dispose of concrete and A.C.debris. - - - F2
<br />
|