<br /> SITE PLAN SCALL 1°-20'—G' TANK INSTALLATION NOTES GENERAL ELECTRICAL N �L
<br /> ®
<br /> 0 WML 500 GUM MODEM 16 DOUBLE WALL STEEL COMPOSITE TANG TAMC m BE SET 48'MMM 1.INSULATED RANGES a 0 OR SHIRT SECTION OF PC CONDUCT TO
<br /> SECON,D�S7REET BELOW MOO GRAPE.�ITR m WICTOFIELD DETERMINE EXACT BURY DEMBACKFU WITH CLEW WASHED SAID. DE USED ON ALL Lautown Pm a comam AFTER Run
<br /> THE FOLLOWING REQUIREMENTS 0INSTALL AN 8'REDffam COmmix TANK SLAB WITH/4 o 12 BOTH WAYS.SET MANHOLE COVERS 3'ABOVE OTTER EDGE PENETRATION.ARE TO BE MET: OF SLAB (SEE TLK sE !) T.ALL CONCURS TO H INATIONAL ELECTRIC CDOE ALL JP-8=�l ,
<br /> EXPLOSION PROOF
<br /> &72 H OUIR NOWOMON PRIOR TO TANG IWAUATKkL �..MUM SPACE MONITOR. WNHOE GONER TO BE LOCKABLE a WAIERiK:T.SEE TAN(SECTION) KKIARK+CRSS-2 OR CRWSE-IWWS qN BOOM
<br /> b.LANK SOW m BE INSPECTED BY COPA
<br /> AT(3)THREE SEPARATE CD SIRUCIION PHM ®4'FILL MM (MANHOLE COVER TO BE WATERTIg1T.SEE TANK SECTION) 3.USE CABLE CONNECTOR FITTINGS(CWM-IWNIS COB OR
<br /> I.TANK a PRIMARY PIPING FtIDROSFATMJJ.LY OR s 4'VONT R�ER EOUN/MEMI)AT MOMIOR a LEVEL GUIDE CARIE C�m
<br /> PNEUMATICALLY TESTED P�30 MNUES O (W181OE COdER m WATERItOif. SEE TANK SECtION) J-gOKFS a PIPE RnMM N SNP BOXES.
<br /> I INSPECTION OF ALL AWIAARf MMMMM, ©j4''ELECTRONIC TANG CAUGE PROBE USER. (A1AlIIOIE WM TO BE LOCKABLE AND WA7WW.SEE TANK SECTION) 4.ALL UNDERGROUND CONDUITS AND CONDUITSNSIMM OUTDOORS 70
<br /> INCLUDING TESTING,IN ACCO WON BE PVC COATED NO ALL CONDUITS INSTALLED PM BUILDING MAY
<br /> 3 FINALMWACIURER10N LADMINES.ALL PORTIONS CAPACITY. IOVERIF .ALARM a OVERFILL MMM S ITCIMAIN.M TO R MAIM SAL ACTAXTE AT 90%TANK DE OMT(COMPRESSION TYPE Rnvm OaY).
<br /> THE LEAK DETECTION SYSTEM. Q E%ST=VEMER-ROOT TLS-350 PUTS TAMC MONITORING PANEL TO REMAIN.EXISTING POWER AND COMMUINCA71011 C== 5 CONIRACTOt m PROVDH a IWA L RAL On AS REONRED To
<br /> 12500'
<br /> Q TALK SYSTEM MMMM TESTS FORWARDED a APPROVED m REMAIN. FACILITATE ATE WI E PULING
<br /> CIRA PRIOR TO TANK SYSTEM
<br /> X= ),=- X=7r=t= X= x=X— — BEING PLACED N OPEPA70L O INSTALL 3/4'SUPPLY AND t'KA MI WESTERN FIBERGLASS FLEXIBLE FUEL LINES.SLOPE 1/4'PER FOOT DOWN m TANK. &NE EMAP".KWM AND SYSTEM COMPONENTS LWSF BE
<br /> NSMUFD N STRICT WITH MAMRACRNER'S
<br /> d 57717E WATER RESOURCES FORMS(FORMALLY A,B,AND INSIDE 4'SECONDARYISTR)CTIOS AND SPECIIGITIO!L
<br /> C)MUST COMPLETED a SUBMITTED TO ED PAMTAMC INSTALL 2'DOUBLE WALL VENT ULE.SLOE 1/4'PER FOOT DOWN 70 TANK.(SEE DETAILS) 7.ALL CMUMN m DE THAM CU OR BIDDER SHR$DED CABLE
<br /> L ALL CODN75 TO BE MINIMUM 3/4 INLM NOTED aTERIRSE.
<br /> EXISTING s AN LMVRND,�D RELEASE RESPONSE PLAN MST BE „ INSTALL NEW VENT RISER.(SEE DETAILS)
<br /> suewnED Is APPROVED BY CUPA
<br /> b 8 BUILDING PRIOR TO TANK OPM70M ®KXxIIRALTOR TO COMPLETE ALL ANT TESTS RECURRED BF GOVERNMENTAL.ATE
<br /> m Silk r'cpPE4 a FINANCIAL RESPONSIBILITY si>BwttED m ©ALL MANHOLES AND BOSS TO DE INSTALLED STRAIGHT TRE.N-LME,AND 3•ABOVE OPER EDGE OF SAB. HAZARDOUS AREA NOTES
<br /> TDff;LOCAL I PLOAENIpD >4CONTRACTOR To APPLY'smr'mum To ALL,KIDS M WESTER!F'MEROAss SEcomaw CpNmum SYSTEM AND AT
<br /> A(;ENCKS MAY HAVE ADDITIONAL ENDS OF VANS CONDUIT SLEEVE N AN OUTSIDE LOCATION,AN'F AREA UP m le LOVE GRADE
<br /> RE0IMEAD115 LEVEL t® I"MY TIGHT TANK FILL PIPE
<br /> SF3SOR CONDUIT a CODUCTOt RMI.CONTRACTOR TO ONLY.Y(1)BELDEN BFIDFOX/83710 1DOR WAUM CABLE(16 SHALL BE MCLASSIFIED ASY
<br /> AS A CCLASSDIVISION 2 HAZARDOUS AREA
<br /> AWG MIL)WITH 10 CONDUCTORS N EACH CONDW.CABLE TO CONTAIN 2 CONDUCTORS FOR EACH MGM ALL TANK AND THE SPHERICAL VOLUME WPM A Y-0'RADNS DE ANY TANK VENT
<br /> PM VAUU SENSORS TO DE INCLUDED N ONE(1)WE RUN FROM TAW ARRA TO TLS-350 MONITOR CONSOLE PPE SHVML DE CLASSIFIED AS CLASS 1 DIVISION 1 HA7ARDWS
<br /> ENLARGED SITE PLAN SCAB Ile-l—D' is CONTRACTOR TO REPLACE MY A/C PAVING DAMAGED DURING FUELING SYSTEM ISMVJATKN WITH NEIL 4'PAYING OVER g•CRO. ION 3-0'AND W-M RADIUS AS MASS 1 DIVISION 2
<br /> HkURDDUSMURRY SEAL-COAT ALL NEXT A/C PAVING. ALL ELECTRIC&CONDUITS,FRONGS,EIC.N THESE AREAS SHALL
<br /> CONTRACTOR TO REPLACE ANY CONCRETE DAMAGED DURING TANK SYSTEM INSTALLATION WITH NEW CONCRETE m MATCH D09M CONFORM 70 THE LATEST EDITION O:N.E.C.ARTICLE 514.
<br /> ©N swnON,SUPE,COLOR a KID. ELECTRICAL WRING AND EQUIPMENT BELOW A HAURDOS AREA
<br /> SHALL BE RATED FOR CLASS 1 DIVISION 1.PROVIDE SEAL-OFF
<br /> ' t®
<br /> CONTRACTOR TO LOOSELY WRAP WESTERN FMEROASS SECONDARY WITH INSULATED 12 GAUGE COPPER WIRE FROM TANK PIPING
<br /> FITTINGS ON ALL CONDUITS DIFERNG OR LEAVING A W17MDOUS
<br /> AREA
<br /> SUP EXCT PONT TO PIPING VAULT TRACER 7ER IRATKN BOLT ATTACHMENT PER DETAIL 1 ON SHEET F4.B07H TRACER WAIFS
<br /> (E)BUILDING TO BE ATTACHED TO BOLT CAST N VAULT WALL.ATTACH PLASTIC SIGN INSCRIBED WITH 1'BLACK LETTERS ON A WHITE
<br /> BACK-GROUND N VAULT.SIGN TO READ'FUEL PPE TRACER'. IMPORTANT NOTICE
<br /> is
<br /> WALL
<br /> r- -- 3 is L VEEDER-ROOT/793480-2011 SUMP SENSOR AT FLOOR ADJACENT TO PIPING WALL PENETRATION APPLICABLE ONLY Section 421 /de 217 of
<br /> faDig Alert the
<br /> i HIEN PIPING VAULT S NOT PRESENT.PRESENT. GwemmeCorequires
<br /> Number be issued before
<br /> s I 4 Q (E)GENERATOR a Permit to Excavate will be valid For
<br /> I 10 ® AL 5 F4Fa AND MMF 1 tSTRIES even SECURITY r ON WALL FOR=RAGE DE TLS-350 PRINT-OUTS.SEE your Dig Hart M Number Coll
<br /> (E) Underground
<br /> SIDEWALK I 1 STORAGE ©PROVIDE 3M 31 GAL DN PETROLEUM SPILL KITS GRMtGER STOCK IF 5F834(800-994-2343 EXT.87375).(2)NTS PER SLUE mice Alat
<br /> 1�-800-422-413 1-800-642-2444
<br /> CALL TOLL
<br /> III__ _'_ _ __ __ _ _ ____ _______ __ _____ TANK REMOVAL NOTES M SOUTHERN CALIFORNIA IN NORTHERN CALIFORNIAr=77=-----— ----- s---- -----—--
<br /> ------ -- --- --J ®EXCAVATE AND REMOVE EXISTING 500 GALLON D DIESEL TANK NO ASCOCLAFED PIPING REMOVE Too we"Days amara You Dig
<br /> 2 e 74,ee ® (E) I 96 (E)TAP CAN® Earp CONCRETE SLAB.
<br /> CONCRETE x O Er4nowe Note to contractor SW1046
<br /> PAD ® EXISTING; TO KENEDATOO PONT of
<br /> The nd exb,er�at, of any CONSULTANT STAMP
<br /> (E)ARAN LINK FENCE f'2+ R YEHP ANT structures shown an VMS- were
<br /> —x —x —x —x —x —x —x —x —x —x —x —X —x —X x —x —x —x —x —X —x —x —X —x —x —x —x — —X—x -- ®COdP11TOR TO WORDW TEMPORARY GENEAAmR PLACEMENT PRIOR m TANf I AN.SRE WS AVMABIE TAa (FUR obtobwd gy a search of avdktNs roea9a.
<br /> ® r3ls US. trim
<br /> nrorPkal andll I sontd keolan heand dm o9 �9 pAprsssra
<br /> Nese underground uMOn to be used and Sj� rY
<br /> elwl be Far a by dom�o to ay Tait,1Q Associates, Inc. _
<br /> spublichow utiMes shown a not Consulting Engineers
<br /> 28M Sunrise Blvd,Ste 206
<br /> Rancho Cordova,CA 95742
<br /> (916)635-2444
<br /> (916)635-2606 Fox
<br /> UNDERGROUND TANK REMOVAL PROCEDURE PIPING INSTALLATION NOTES REVISIONS / AUTHORIZATIONS
<br /> 1. Contractor shall call U.S.A.and how utilities field marked 12.Shore the edge of the tank hole,if repuked. All shoring Is 19.If excavation Is left open overnight,Contractor to completely xuxore... .O m PtPI a b mums V Ansvpes oa[ N
<br /> pry to any excovatlon.In addition,Contractor shall make to be fon plum before excavating tank. fence off the tank hole with six(6)foot high temporary chain - MvstEN aRA y
<br /> visual and magnetic Inspection of work area for any possible link fencing,no exceptions. A lockable gate shoo M ed on all
<br /> underground utilities and conduits.Contractor is responsible for 13.Dig down to the top of the tank sxcovatians left en more than 2 do see orovN
<br /> restoring any underground utilities damaged during construction, open y& _plans for location. INSTALL ALL PNiI OPER MAMSHALL RR's MINIMUM BOD RADEA AND ALL GOND MMAIFACNAEXS OSTALU7K11i
<br /> SPEK*Tu1TKNS CONTRACTOR SHALL AIR PRESSURE LEST ALL PRIMARY a SECONDARY RING PRKIR TO OR
<br /> 14.Remove the OI(drop)tube and TLS probe. Disconnect the 2O,Upan approval of sBC Faclity Engineer and SBC Environmental TMG TO WKS AND GENERATORS.SCUTE AND CAP ALL PRIMARY PIPING RUNS a PRESSURIZE m 75 P.S.I.0M.)2.Notify SBC Facilities Engineer,. .Site O.gongs,and product and vent Nines. Cap w plug open Manager.Contractor shall install new tank FOR 34 MINUTES(MN.),OR LONGER AS REAIARED BY LOCAL AGENCY.SOAP TEST ALL JOINTS AND INSPECT FOR LEAKS
<br /> Contact, and U.S.A.forty-slot ends of the lines which are not to be used further.Remove any REPAIR ANY TEATS DISCOVERED AS REQUIRED. PIPING TO DE AM TESTED MER CONNECTION N CONTAINMENT
<br /> (48)hours prior to start of tank removal or any excavation. remaining liquid from the delivery line using ere to avoid 21.Replace w restore any existing site condition damaged or SLMAP AND IN BUILDING PPE 1RENCI1 AT 3 P.S.I.(MIR.)TO 5 P.S.L.(MAX)FOR 3o MIHlfES(MLI.),OR LDNQIFR As REWIED
<br /> 3.Mose air conditioningInlets subject to fumes Mr to work spMag& altered during the took removal and ibstaUatbn,remove sheet BY LOCA AGENCY SOAP TEST ALL CONNECTIONS AND, LVD ASPECT FOR LEAKS REPAIR MY LEAKS DISCOVERED� PROPRIETARY SBC INFORMATION
<br /> luuc W piling. REWIRED.MOTTTAN THE AIR TEST ON THE SECONDARY CONTAINMENT PIPING GROG THE BACKFILLING PRESS AND VERIFY NOT FOR COCK USE OR"D5f2DSIRE OUTSIDE OF SBC
<br /> 4.Po'si In' existing underground IS.Plug all tank openings with one.plug.to have 1/8Inch,vent.. . THAT FO'PRE-SURE'DROP OCCURRED IN THE SECONDARY PIPING.
<br /> IN FOR LRAM REPAIR ANY-LEAKS-DISCOVERED.EFg6. - ".,. ... .NNS, MAYON.Y;BE USED BY AUDgRTZFD:.PERSONNiL-OF,
<br /> g ground tank"I be removed and disposed hold for temperature expansion. 22.AN water and-sol tests shall have results submitted to the 11108=1 PIPING RUNS,BOTH PRIMARY AND SECONDARY RING SYSTEMS TO DE DETESTED PER AFOREMENTIONED THE LOCAL GOVERNMENT AGENCY IN CONNECTION WITH APPLMA71ON FOR
<br /> of by SBC Contractor.Contractor Shall fumish fuel disposal environmental management department of SBC within 24 hours PROCEDURISL THE TESTING OF THE PRIMARY AND SECONDARY PIPING MUST DE M 413SO BY OMROADM W&GEMENT PERMITS AND AMi0RSA71014S FOR WILDMGS,COS1I1UC11OI,AND/OR
<br /> dowmer4ation to SBC. I&The tank shag be made Inert by using thirty pounds of dry after the somples are taken. AND LOLL REGULATORY AGENCIES.AFTER SNCCESSF10.COMPLETION OF PIPING TEST.CONTRACTOR TO RAL BARIC REDUCING ZONING CHANGES,
<br /> S.
<br /> will apply for tank removal permit Contractor N b�localher ousan las.llons of tank capacity or as required BOOT FROM SE'CONOaRY PIPING IN TANK SMP TO ALLOW UNRESTRICTED DRAINAGE FROM SECONDARY PIPING SY U NIDI THE DRAWIGS PRtipNED FOR
<br /> responsible for picking up permit.paying fees,and arranging. Y CONSTANTLY MCNRORED TAMC SLIP.
<br /> bepeatione.AN tank and piping removal Is by Contractor. 17,After tank has been Inspected by local hadth and fire -
<br /> Contract"shall cooperate with•Environmentd Contracts for Inspectors,excavate and remove tank and piping.Contractor to CORPORATE
<br /> sog/water sampling and disposal of tank load tank and piping on transport provided by others.Disposal - REAL ESTATE
<br /> of tank and piping by En"Contractor.Contractor to remove Tuan SUMP PRESSURE TESL' -
<br /> S.Provide fire extinguishes of she and rating specified by and dispose of existing concrete Ue-down slab beneath tank N
<br /> local fire depatments. - specified M Scope of Work on sheet F1. ALL WOOLY INSTALLED TANKS AND TARNS RETROFITTED WITH NEW SUMPS OR NEW HARDWARE THAT ENTERS OR DOS A SAP ARE 70
<br /> BE WOMMICALLY 7ESIED WITH A WAD OF WATER ONE FOOT ABOVE THE HYGHIST PONT OF PENETRATION OR JON ALTERNATIVELY,7.There shall be no welding or other sources of ignition fon the 1&After the existing tank is removed,seg and/or water samples MAPS MAY DE VACUUM TESTED PER NAMMFURM 1 Ins,
<br /> ESCALON
<br /> area while the removal operations are in progress There shoo will be taken from the tank Fele by the Environmental
<br /> be no smoking on the job site.'NO SMOKING'signs shall be Contractor.If the sol/water samples aro dean,than well
<br /> pasted. shall be disposed of by Contractor.It contamination is 1812 COLEY AVENUE
<br /> discovered,Contractor to notify SBC Environmental Manager
<br /> 8.Provide barricades with flashing yellow lights and warning Immediately Contaminated=3 In to be steed separately ESCALON, CALIFORNIA
<br /> signs to protect pedestrians and/or motor vehicles from an vlsqueen and covered with visqueen and anchored Firmly to
<br /> work area and tank hole. prevent It from being blown off.Provide an asphalt,concrete or CLLC=ESCLCAI i UG010
<br /> sandbag berm wound all dirt stack piles to prevent runoff.
<br /> 9.Drain,and when appropriate,flush product In the piping Into the - Ospoeel of contaminated sell wll be under separate contract TMA UNDERGROUND FUEL TANK
<br /> tank. Dhposd of contaninoted well ell be by Environmental
<br /> Controctw.Centroctor shall load contaminated sell an truck SU.(.TION SYSTEM
<br /> 1O.The Rinse Contractor shall remove all remaining flammable liquid provided by Environmental Contractor. TANK REMOVAL/INSTAId.ATlON NOTES
<br /> from the tank which can be pumped out It may be necessary
<br /> to use o hand pump to remove the bottom few Inches of enicam MMBn ser:09/16/03 Ave AS NOTED
<br /> product and rknwt&All residual liquid or sludge,Including
<br /> rinstate will be disposed of by Environmental Contractor.
<br /> Mum on ON Iaecaa N: sl
<br /> 11. a awewt and remove concrete A.C. cover for seemSM 2 OP. 9 AXEa S IOD.
<br /> ts to see DRAWN;Mak
<br /> tank disponi of concrete and A.C.debris. - F2