Laserfiche WebLink
AMIL Ah <br /> SITE PLAN SOME 1116W-a• TANK INSTALLATION NOTES W GENERAL ELECTRICAL N _._.s <br /> ® <br /> CN TREET 09 MSTALL 5CO GWLON MODERN wiLo G-wilia,6 wMiLE WALL Sm. NK.TATANK To BE SET 48'MINIMUMSECBELOW FINISHED GRADE.CONTRACTOR TO FEUD DETERMINE EXACT BURY DEPIN,BACKFILL WITH CLEAN WASHED SWM. 1.U7 RANOs!KIT OR SHORT <br /> THE FOLLOWING REQUIREMENTSPOEmAON ALL UNDERGROUND PIPING&COMMIS AFTER BUILDING <br /> mK <br /> ARE TO BE MET: ®OF ALL AN(SEE TAW SUIS WITH/4 0 12 BOTH M65Y& F MNAKRE COVERS 3•ABl7�COOTER EDGE 2.ALL Cg DINTS To HW SEAL-OFFS PER LATEST EMKK91 OF THE <br /> NATIONAL ELEORIC CODE ALL J-am TO BE mom PiKtOF, <br /> s,72 HOUR NOTIFICATION PRIOR 70 TANG I WALARON. ©3 MUM SPACE MONITOR. 0141HO E COVER To BE LOCKABLE Nk WATERTIGHT.SEE TANK SECTION) MARK+CRSS-2 OR CROUSE-HINDS CUA SERIES. <br /> 0.UNI(SYs1EMS ro BE INSPECTED BY CPA <br /> At(3)THREE SEPARATE CONSIRIXI tl PWLSE4 ®4•RLL RSM (NWBDLE SLIVER ro IE WAIMMi0.SEE TANK SECTION) a USE CABLE CONNECTOR MM(CROUSE-MWD6 CO OR <br /> 1•PNEUMATICALLY 7LSRD MR 30 IMTANK&PINWRf MING MURES. CO ®4•VENT BSER. (YANIigE COVER TO BE WATERIMNrf. SEE TANK SECTION) J- NE3 PPE FlR9d65 M BOXES.EVEL GM CABLE M#1ECT0NS TO <br /> i INCLUDING <br /> E ALL SECONDARY ©4•'ELECTROIC TNM GALME RAISER. (MINIOLE COVER ro BE LOCKABLE AM WATEIMM SEE TAN(SECTION) 4.ALL CONDUITS NO COMM=°S7ALLfD OUTDOORS TO <br /> NY21UDildG TES18M,R ACCORDANCE WON BE PVC CDGED PJGD.ALL COMM INSTALLED WIDE MUM M MAY <br /> MMANACNRER•S GUIDELINES. O EXISTING OVERFILL MAN h OVERFILL MAN ACKNOWLEDGMENT SWITCH TO REMAINL ALARM SMALL ACTIVATE AT 90R TANK BE EMf(COMPRESSIDd TYPE ITTI Ms OXY). <br /> i FINAL INSPECTION,INCLUDING ALL PORTIONS OF WACittY, <br /> M LAN(DETECTION SYSTEM <br /> ®TO REM NEEDtR-RCOT 115-350 Plus TANK MMIMDmNM PANEL.ro REMAIN.EXISTING POW AAIO COMM s.COMmATE W ro PROVIDE 3 NSfALL PULL BOXES As REQUIRED ro <br /> e TANK SYSTEM NR TO TA TESTS fOWWWDED A APPRWED TO REMAIL FACIDA7E CORE PULLING. <br /> 125.00• BY CEPA PRIOR ro TAW S11TD1 <br /> X= X= X=7c=T X-Xa X---'7-- 6.ALL EOAPNFM WJmWME NA MIEN COMPONENTS MUST BE <br /> BERM PLACED R OPDN7DN Qs 0NSIALL6VU 3/4'SUPPLY SEC 1•RY DU WESTERN FIBERGLASS FLFXHNE FUEL LOSS.SI.�E 1/4'PER FOOT GOWN ro TMX 9STALLED IN SM CONFORMANCE WITH MNARAC URFR'S <br /> d STATE COATER RESOURCES fDWS(FORMNLY A lL AND ASfPtI INSIDE 4'SECONDARY DIME. INSTRUCTIONS AID SPECIFICATIONS. <br /> C)MUST BE COMPLETECOMPLETEDNE SIN3M(TFD PRIOR TOTAN( OSTML Y DOUBLE WALL VENT t2E.SLOPE 1/4'PER FOOT DOWN TO TANK.(SEE DETAILS) 7.ALL CODtM7ORS 7o O BONN CU OR BEIDEN SIRIDED CABLE. <br /> B.ALL COIDLx1S TO DE WMN 3/4'UNLESS N07ED OTHERWISE. <br /> EXISTINGSUBMITTED&APPROVED IT(CUPA <br /> a AN UNYmDRRED RELEASE RE90M PLAN MST BE r )STALL NEW VENT REM(SEE DETAILS) <br /> K 8 <br /> Blip CRIG PRIOR 70 TAW OPERATIONS. 1®011RACIOR TO COMPLETE ALL EQUIPMENT TESTS ROD M BY GOVERNNff1OAL AGENCIES. <br /> m I f.EVIDENCE OF FNMNCAI RESPaaBNn7•SUBMITTED TO ALL MANHOLES AND BOXES ro BE ISIALLED SRAxxB THE,ON-UW.ASD 3•ABOVE MITER EDGE OF SLAM HAZARDOUS AREA NOTES <br /> Ifni Lora IMPLEMENTING O4 CONTRACTOR TO APPLY•SEALITIV SEALANT TO ALL JOBITS ill WESTERN FIBERGLASS SECOMARY MU M W SYSTEM AND AT <br /> AGENCIES MAY HAVE ADDITIONAL ENS OF VAULT COMIAT SLEEVE. IN AN OUTSIDE LOCATION,ANY AREA LP TO 18•ABOVE IODIDE <br /> %=X cX ®J( ==X - LEVEL WITHIN S•-0•HORIZONTALLY FROM AMY TKAO TAN(FILL PPE <br /> 125. - - SENSOR CONDUIT Be CONDUCTOR RUT.CONTRACTOR TO RUN ONLY(1)OEM BELDFOX OVID 1DOx Mom CABLE(16 SIAL BE CLASSIFIED AS A CLASS i DIVISION 2 HAZARDOUS AREA. <br /> ;NIG MR)WITH 10 COMUCtDRs R MCH CONDUT.ME TO CONTAIN 2 CONDUCTORS FOR EACH SENSOR.ALL TANK AND THE SPHERMAL VOLUME WITHIN A 3•-0'RADIUS OF ANY TANK VENT <br /> MING VAULT SENSORS TO BE INCLUDED IN ONE(1)HOME RUN FROM TANK AREA 70 TLS-350 Will=CONSOLE. PPE SHALL BE CLASSIFIED AS CLASS 1 DIVISION 1 WARMS <br /> ENLARGED SITE PLAN suss,/4•.,-0• ,e CONTRACTOR TO REPLACE ANY A/C PAVING DAMAGED DURNM FUELING SYSTEM INSTALLATION WITH NEW 4'PAVING OVER 9•CRI. HAZARDOUS ARNP�AND 5-0•RADIUS As CLASS, DIVISION 2 <br /> 1 SLURRY SEAL-COAT ALL MEW A/C PAMNG ALL ELECTRICAL CONDUfl%FTr MS.ETC.IN THESE AREAS SHALL <br /> ©t +WRACTOR TO REPLACE ANY CONCRETE DAMAGED DURING TANK SYSTEM INSIALIATDN WITH NEW CONCRETE 70MATCH MSTNC CONFORM TO THE LATEST EDITION OF N.EC.ARTICLE 51C <br /> IN SECTION.SLOPE.COLOR @ IRM. ELECTRICAL WIRING AND EQUIPMENT BELOW A HAZARDOUS AREA <br /> SHALL BE RATED FOR CLASS 1 DIASIOJ 1.PROVIDE SEAL-OF <br /> t t®CONTRACTOR TO LOOSELY WRAP WESTERN FIBERGLASS SECONDARY WITH INSULATED 12 GAUGE COPPER WIRE FROM TANK PIPING FIF1 iDS ON ALL CONDUITS ENTERING OR LEAVING A WAiDDUS <br /> SUMP EXIT POM 70 PIPING VAULT TRACER TERMINATION BOLT ATTACHMENT PER DETAIL 1 ON SHEET F4.BOTH TRACER WIRES <br /> (E)BUILDING '0 BE ATTACHED TO BOLT CAST R VAULT WALL ATTACH PLASM SIGN INSCRIBED WITH i'BLACK LETTERS ON A WHITE <br /> Bid(-GROUND W VAULT.SIGN TO READ'FUEL PIPE TRACER'. IMPORTANT NOTICE <br /> SWUM 4216 CSTALL VE7DER-ROOT/793460-201 SUMP SENSOR AT FLOOR ADJACENT TO PIPNM WAIL PENETRA7ION1.APPLK:ABLE OXY Guverrment C de a17 of trequires a Dig Alert <br /> WHEN PIPING VAULT IS NOT PRESENT. Medl0cation Number be Issued before <br /> s I 4 Q (E)GENERATOR a Penit to Excavate will be valid For <br /> (E) to FESTIVAL 5T SLEET FT�(2) INDUSTRIES O SECURITY r ON WALL FOR STORAGE OF TLS-350 PRIM-OUTS SEE your Dig Alert D Number C� <br /> round <br /> SIDEWALK ( , I STORAGE ®PROVIDE 3M 31 GALLON PETROLEUM SPIT.KITS GRAIMGER STOOK/sFNLu(1100-99+-230 Off 97375).(a)KITS PER SITE. SaViUndece Alert <br /> L I I - - t ° CALL-TOL FREE CALL•TCLL FTSE <br /> I TANK REMOVAL NOTES N SSoun�i�-4133 IN DRIHIE M CALIFORNIA <br /> Le==e= - ------ - ----- ------ <br /> ------ ----- •- Two Work"Days Odom You Dig <br /> - ----- X----- ----- ----------------------------®®®J EXCAVATE AND ROAfNE EXSfID SCO GALLON DESEL TAW AND LID UNDERGROUND PIPING ROM <br /> 2 91418 '© (E) -- to (E)TAP CAN® ----- ENTIRE Engineers Nate m SW1046 <br /> CONCRETE x ®REMOVE EXISTING PRODUCT PIPING ro GENERATOR POND OF <br /> PAD The 0xistenCe 0nd legion of any CONSULTANT STAMP <br /> (E)CHAIN LINK FENCE ®RUM EXISTING VENT PPNM AND EXISTING VENT RISER. underground wudm POW smehuou _gym/sues <br /> -X -X -x -X -X -X x -x -X -X -X ->t -X -X X -X -X -X -X -x -X -% -X -X -X -% -X -X -X -% - d,0 con <br /> ® - - - - - - ®CONTRACTOR ro COORDARPQE TEMPORARY TDR PINEllO7f PRIOR ro TANK REM01rAL.SITE MAS AVAILABLE TAP BOK FOR by a wand of avoikMe records. <br /> AMM R� <br /> 7105 LASE. 7M contractor <br /> shall ascertain SIM Inn 4SorCssr <br /> verged and horizontal location and eke of Apm <br /> ,RIO ►• ry Y <br /> these wdelgroud uMNes to be used and w w <br /> shall be responsible for any dannge to any Tait&Associates, Inc. <br /> Public or el l P n or red Consulting Engineers eNt x.o4Arss <br /> 2880 Sunrise Blvd. Ste 206 Ems.3a1-2Ka <br /> Rancho Cordova,CA 95742 <br /> (916)635-2444 <br /> (916)635-2606 Fax <br /> UNDERGROUND TANK REMOVAL PROCEDURE PIPING INSTALLATION NOTES REVISIONS / AUTHORIZATIONS <br /> 1. Contractor shall call U.S.A.and have utAithas fold marked 12.Shore the edge of the tank hole,H required. NI storing Is 19.If excavation Is left open overnight Contractor to completelyJ1�EE;OHOOJO FUEL sySYEH nwnNc HL mom V Amonaam °E an <br /> prior to any excavation.In addition,Contractor shall make to be in place before excavating tank. fence off the tank We with six(6)foot high temporary chain <br /> vleud and magnetic Inspection of work area for any possible link fencing•no exceptions.A lockable gate"I be provided on all <br /> undarground utilities and conduRs.Contractor Is responsible for 13.D down to the t of the tank. MASIER nhxaG� a/v/es <br /> restoring any underground utilities damaged during construction. excavations left apes more than 2 days.Ses,planks for location. SPEAR ALL Pti?RM PER TOR SHALL AM BOD WIDRS AND ALL GOND MNPIPING ITER$NSTNIA7KOR <br /> SPECO'CA7DNS CONTRACTOR SHALL AR PRESSURE TEST ALL PRIMARY Nle SECONDARY PIPING PRIOR 70 BACIaULL11D Oft <br /> 14.Remove the fill(drop)tube and TLS probe. Disconnect the 20.Upon approval of SBC Facility Engineer and SBC Environmental CONNECTING TO TANKS AND GENERATORS ISOLATE AND CAP ALL PIPING RUNS Nle PRESSURE TO 75 Pal.(MHN.) <br /> 2.Notify SBC Facilities Engknser. Site fill.gauge,and product and vent lknee. Cap or plug open Manager.Contractor shall install new,tank. FOR 30 MINUTES(MIN.),OR LONER AS REQUIRED BY LOCAL ADM.SOAP TEST ALL JOINTS AND WWW FOR LEAKS <br /> Contact.-and U.S.A.forty-eight ends of the lines which aro not to be used further.Remove any REPAIR ANY LEAKS DSCOVM AS REQUIRED.SES PPBD TO BE AR TESTED AFTER CONINECMI IN CODA NT <br /> (48)hours pry to stat of tank removal or any excavation. remaining liquid from the delivery Ilene using sae to ovoid 21.Replace or restore any existing site condition damaged a SUM AND IN BUILDING PPE TRENCH AT 3 P--;J.(MMI.)TO 5 P.S.I.(MAR.)FOR 30 MINUTES(MRN.),OR LONGER AS REQUIRED <br /> epilogs. altered during the tank removal and installation•remove sheet BY LIXX AGENCY.SOAP TEST ALL CONNECTIONS AND JOINTS AND INSPECT FOR LEAKS REPAIR ANY IBM DISCOVERED AS PROPRIETARY SBC INFORMATION <br /> 3.Close air ecadltlernIng Nets subject to fumes pylar to work. piling. SECOINDARYCOMIADAWPIPING FILUNG;PROCESS NO VEWY NOT FOR GEIEIK USE OR*DISCLOSURE OUf�E OF� <br /> 15.PIug all tank openings with one.plug to be"1/8 Inch vent - - THAT NO�PRE-M RE- OCCURRED THE SECONOM PIPING.INSPECT FOR LEAKS.REPDURING THE S LEAKSDSCOVERED.u� - THIS INFORMATION MAY ONLY IE USED BY AUTHORIZED-PERSONNELOF <br /> 4.'Fuel In existing underground tank shall be removed and disposed hod for temperature expansion. 22.AH water and soli tests shall have remits submitted to the BNZDAM PIPING RUNS,BOTH PRIMARY AND SECONDARY PIPING SYSTEMS TO BE RETESTED PER AFORDOOKINED TIE LOCAL GOVEIMENT AGENCY IN CMKCC111O)MBI APPLICATION FOR <br /> of by SBC Contractor.Contractor shall furnish fuel disposal environmental mom PROCEDURES.THE TESTING OF THE PRIMARY AND SECONDARY PIPING MUST BE WITNESSED BY ENVRONMENUL MAMACEMENTPEIMIS FOR ANII/OR <br /> Y 9 y Pounds of dry after the samples mestakerh.epartrnorht of SBC wlthIn 24 haws AND LOCAL REGULATORY AGENCIES.AFTER SUCESSFIA COMPLETION OF PIPING TEST.CONRWIDR TO PUL BACK REDUCING ZOOM� � BU2DNG5.�, <br /> documentation to SBC. 96.The tank shah be made inert b using thirty <br /> lee per thousand gallons of tank capacity or as required COOT FROM SECONDARY PIPING IN TANK SUP TO ALLOW UNRESTRICTED,DRNNWGE FROM SECONDARY PP9M MTEM INTO THE DRQ PREPARED FOR <br /> S. will apply for tank removal permit Contractor Is by coed authorities, COiSVITLY MONITORED TANK SUP. <br /> responsible far picking <br /> up permit paying fees,and arranging <br /> Inspections,AD tank end piping removal is by Contractor. 17,After tank hes been Inspected by local health and fire <br /> Contractor shall cooperate with*Environmental Contractor for Inspectors•excavate and remave tank and piping.Contractor to CORPORATE <br /> sol/water sampling and disposal of tank. load tank and piping an transport provided by others.Disposal REAL ESTATE <br /> of tank and piping by Enka.Contractor.Contractor to remove IBdif.S!!MPyRESSIII�Y,sr <br /> 6.Provide fine extingulshero of size and rating specified by and dispose of existing concrete tie-down slab beneath tank N <br /> local tiro departments. specified In Scope of Wok on sheet F7. ALL NEWLY INSTALLED TANKS AND TANKS REmOFlPTfD WITH MEN SUMPS OR MEW HARDWARE THAT ENTERS OR EXITS A SUS ARE TO <br /> BE NNDA6STAMALLY 7ESIED MRI A TEN OF WATER ONE FOOT ABOVE THE I x§W PONT OF PDOMIN OR JON.AL7EAN MUy. FRAW ane <br /> 7.There shill be no welding or other sources of Ignition in the 18.After the misting tank is removed•orae and/or water samples SLAWS MW BE VACUUM TESTED PER M4d1FACURER'S WSDiucnDMS. ESCALON <br /> area while the removal operations ore In progress.Thee shall will be taken from the tank hole by the Environmental - <br /> be no smoking an the Job alts,*NC,SMOKING*signs shall be Contractor.If the soA/water samples aro dean•then eaA 1812 COLEY AVENUE <br /> posted. shall be disposed of by Contractor.If contamination b <br /> discovered.Contractor to notify SBC Environmental Manage ESCALON, CALIFORNIA <br /> 8.Provide barricades with flashing yellow lights and warning Immediately. Contaminated=1 is to be stocked separately <br /> signs to protect pedestrians and/or motor vehicles from on visquaen and covered with viepuees and anchored firmly to CLLC=ESCLCAi i 00010 <br /> work area and tank hole. prevent N or from being blown oft.Provide an asphalt, concrete <br /> sandbag berm Ground all dirt stack piles to prevent runoff. <br /> 9.DraIn,and when appropriate•flush product in the piping into the Disposal of contaminated sol will be under separate contract ' UNDERGROUNDUEL.FTANK <br /> to k. DContractorr.Csposal of ontractor*,�Load contaminatedNei to truck SUCTION SYSTEM <br /> 10.The Rinse Contractor shall remove dl remaining flammable liquid provided by Environmental Contractor. TANK REMOVALANSTALLATION NOTES <br /> from the tank which con be pumped out It may be nacessay <br /> to use a hand pump to remove the bottom few Inches of Bosom NLRM -09/16/03 toes AS NOTED <br /> product and rkneote.AN residual liquid or sludge,Including <br /> DOW UP. DW GWaaD en 51 <br /> rinatate AAI be disposed of by Envkmestd Contractor. <br /> SIM AUDOFAM k MEET a an: 9 Was wh07 00 <br /> 11.Sowcut and remove concrete or A.C.cove far awns to sm owmm Wo <br /> F2 <br /> tank,dispose of concrete and A.C.debris, <br />