Laserfiche WebLink
SWRCB, January 2002 <br />6. PIPING SUMP TESTING <br />MOM <br />Test Method Developed By: ❑ Sump Manufacturer ® Industry Standard ❑ Professiona , <br />ElOther (Specie) " �l <br />Test Method Used: ❑ Pressure ❑ Vacuum ❑X Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Incon TS -STS I Equipment Resolution: .0006 <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Sensors were reinstalled at lowest point and not tested. <br />Piping / Fill Sump Visual FAIL due to torn Supply and Return Secondary test boots <br />Piping Transition Sump FAIL possible test boot issues. <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />Piping UG01 00001 <br />IVent 0001 00001 <br />I Pipe Tran UG01 0001 <br />Sump Diameter: <br />48.00" <br />26.00" X 18.00" <br />28.00" X 28.00" <br />Sump Depth: <br />60.00" <br />36.00" <br />36.00" <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />24.00" <br />14.00" <br />14.00" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />18.00" <br />27.00" <br />27.00" <br />Condition of sump prior to testing: <br />Good <br />Good <br />Good <br />Portion of Sump Tested' <br />2" Above Highest Pen <br />2" Above Highest Pen <br />2" Above Highest Pen <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?" <br />Dyes ❑No ONA <br />❑ <br />❑Yes ❑No IXINA <br />❑NA <br />—]Yes ❑No X <br />❑Yes ❑No ❑NA <br />Turbine shutdown response time <br />N/A <br />N/A <br />N/A <br />Is system programmed for fail-safe <br />shutdown?` <br />❑Yes [:]No [H]NA <br />❑Yes ❑No X NA <br />❑ <br />❑Yes X NA <br />❑No ❑ <br />❑Yes ❑No ❑NA <br />Was fail-safe verified to be <br />operational?* <br />❑Yes ❑No ❑X NA <br />❑Yes ❑No FX <br />❑Yes ❑No FX <br />❑Yes [—]No ❑NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />15 Min. <br />15 Min. <br />15 Min. <br />Test Start Time: <br />N/A N/A <br />9:03 AM 9:22 AM <br />9:03 AM 9:22 AM <br />Initial Reading (Rj): <br />N/A N/A <br />5.9235 5.9213 <br />5.9795 6.5323 <br />Test End Time: <br />N/A N/A <br />9:18 AM 9:37 AM <br />9:18 AM 9:37 AM <br />Final Reading (RF): <br />N/A N/A <br />5.9218 5.9200 <br />5.9761 6.3160 <br />Test Duration: <br />N/A N/A <br />15 Min. 15 Min. <br />15 Min. 15 Min. <br />Change in Reading (RF -RI): <br />N/A N/A <br />.0017 .0013 <br />.0034 .2163 <br />Pass/Fail Threshold or Criteria: <br />.002 .002 <br />.002 .002 <br />.002 .002 <br />Test Result: <br />❑ Pass ❑X Fail <br />❑X Pass ❑ Fail <br />❑Pass ❑X Fail <br />❑ Pass ❑Fail <br />Was sensor removed for testing? <br />❑X Yes ❑No [_]NA <br />[E]Yes ❑No ❑NA <br />❑X Yes ❑No ❑NA <br />❑Yes ❑No ❑NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />❑Yes X❑No ❑NA <br />❑Yes ONo ❑NA <br />❑Yes �No ❑NA <br />❑Yes ❑No ❑NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Sensors were reinstalled at lowest point and not tested. <br />Piping / Fill Sump Visual FAIL due to torn Supply and Return Secondary test boots <br />Piping Transition Sump FAIL possible test boot issues. <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />