My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLEY
>
1812
>
2300 - Underground Storage Tank Program
>
PR0231881
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2022 11:15:56 AM
Creation date
6/23/2020 6:59:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231881
PE
2371
FACILITY_ID
FA0003946
FACILITY_NAME
AT&T California - UG010
STREET_NUMBER
1812
STREET_NAME
COLEY
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22715414
CURRENT_STATUS
01
SITE_LOCATION
1812 Coley Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2371_PR0231881_1812 COLEY_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
{ .• L, <br />SWRCB, January 2002 JUL 2 9 2019, <br />Criteria: 1 11 <br />Test Result: ❑ Pass 0 Fail ❑ Pass ❑X Fail I El Pass ❑ Fail r ❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Visual FAIL on Supply and Return Secondary, Test boots torn and need to be replaced. <br />J. 3L' -l"11"lliC I rlrr. l F 311114" <br />Test Method Developed By: <br />❑ Piping Manufacturer ❑X Industry Standard ❑ ProfessionM <br />❑ Other (Spec) <br />Test Method Used: <br />Q Pressure <br />❑ Vacuum <br />❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: 4" Dial Guage <br />Equipment Resolution: .2 <br />Supply UG0100001 <br />Return UG0100001 <br />Vent UG0100001 <br />Piping Material: <br />Poly <br />Poly <br />Fiberglass <br />Piping Manufacturer: <br />Western Fiberglass <br />Western Fiberglass <br />A O Smith <br />Piping Diameter: <br />.75" <br />1.00" <br />3.00" <br />Length of Piping Run: <br />30' <br />30' <br />8' <br />Product Stored: <br />Diesel <br />Diesel <br />Diesel <br />Method and location of <br />Test Boot <br />Test Boot <br />Test Boot <br />piping -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />15 Min. <br />15 Min. <br />15 Min. <br />starting test: <br />Test Start Time: <br />N/A <br />N/A <br />9:01 AM <br />Initial Reading (Rj): <br />N/A <br />N/A <br />5 PSI <br />Test End Time: <br />N/A <br />N/A <br />10:01 AM <br />Final Reading (RF): <br />N/A <br />N/A <br />5 PSI <br />Test Duration: <br />N/A <br />N/A <br />1 Hour <br />Change in Reading (RF -R,): <br />N/A <br />N/A <br />0 <br />Pass/Fail Threshold or <br />N/A <br />N/A <br />0 <br />Criteria: 1 11 <br />Test Result: ❑ Pass 0 Fail ❑ Pass ❑X Fail I El Pass ❑ Fail r ❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Visual FAIL on Supply and Return Secondary, Test boots torn and need to be replaced. <br />
The URL can be used to link to this page
Your browser does not support the video tag.