Laserfiche WebLink
F. In -Tank Gauging / SIR Equipment: <br />Check this box i f tank gauging is used only for iHe lry&iro <br />❑ Check this box if no tank gauging or SIR equipment is in OWdO3 2016 <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. - <br />.11 4'_ L <br />ENVIRONN'BiTA <br />*In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): [X __j <br />Check this box if LLDs are not installed. <br />Complete the following checklist: <br />fYes <br />❑ No <br />---- - ---- - - ---- <br />For equipment start <br />I 'o' -up or annual equipment ceitification, was a leak simulated to verify LLD perform an ce?(Ch eck <br />E] N/A <br />all that apply) Simulated I eak rate: E]3 g.p.h.; ❑Elo-ig. p. h; E]0.2 g.p.h. <br />ft <br />E]Yes . <br />El 0 <br />. ...❑........ <br />..... <br />JW ere all LLDs confirmed operational and accurate within re u] atory requirements? <br />El YesEl <br />No* <br />Was the testing apparatus properly calibrated? <br />El Yes <br />❑ No <br />... . ... ........ <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />El N/A <br />111I <br />EE <br />ElYes <br />. . ................. .. .. <br />No* <br />.... ....... ... . . . ..... . ......... . ...... . .. . .. . ...... . ..... ......... . ..... .... . . ........... . .... <br />For electronic LLDs, does the turbine automatically shut offif the LLD detects a leak? <br />❑ N/A <br />❑ Yes <br />❑ No <br />....... . . ..... .. . .. .. . ..... . . ... . ............ ........ ...... ... . . . <br />-- - -- - --------- <br />Forelectronic LLDs, does the turbine automatically shut off ifany onion of the monitoring system is disabled or 1� <br />El N/A <br />..... <br />disconnected? <br />. . . . . . . . . <br />0 Yes <br />El No* <br />For electronic LLDs, does the turbine automatically shut off Many portion of the monitoring system malfunctions or <br />F-1 N/A <br />❑...... _ .. . ........... . <br />tai Is a test? <br />- - --- - ----- ........... ...... . ...... . ..... . ...... .. . <br />==� ......... ------ ---- - --------- - -- - - <br />For electronic LLDs, have all access i b] e w iri ng connections been visually inspected? <br />F-1 N/A <br />----------- --- -- - <br />11 Ej Yes <br />E:]No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />. . ...... . . ........... <br />*In the Section K below, describe how and when these deficiencies were orwig becorrected <br />H. Comments: <br />Suction System <br />