My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLEY
>
1812
>
2300 - Underground Storage Tank Program
>
PR0231881
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2022 11:15:56 AM
Creation date
6/23/2020 6:59:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231881
PE
2371
FACILITY_ID
FA0003946
FACILITY_NAME
AT&T California - UG010
STREET_NUMBER
1812
STREET_NAME
COLEY
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22715414
CURRENT_STATUS
01
SITE_LOCATION
1812 Coley Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2371_PR0231881_1812 COLEY_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Address : 1812 Coley Ave. <br />UST Monitoring Site Plan <br />Escalon <br />6 <br />2016 <br />95320 <br />aftt ftionitoring Plan Site fliap <br />Drawing NOT to Scale <br />Pacific <br />Bell TelephoneCo. .b, i f i <br />Business Name. <br />12 <br />Bu Address: iColeyAve. Escalon <br />-i --------------- <br />Fuel', Transition Sump <br />Lines w/ Sensor (L4) <br />794380-208 <br />Fill / Piping Sump <br />w/ Sensor (L2) <br />794380-208 <br />Spill Bucket <br />ATG <br />S' <br />Date map was drawn: 2/18/2016 <br />Instructions <br />Ifyou already have a diagram that shows all required information, you may include it, ratherthan this page, with your Monitoring System <br />Certification. On your site plan, show the general layout of tanks and piping. Clearly identify locations of the following equipment, if <br />installed: monitoring system control panels; sensors monitoring tank annular spaces, sumps, dispenser pans, spill containers, or other <br />secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level probes (if used for leak detection). In the <br />space provided, note the date this Site Plan was prepared. <br />Vent Sump <br />Sensor <br />794380-208 <br />SensorAnnular <br />7M90-420 <br />1 Overfill <br />-i --------------- <br />Fuel', Transition Sump <br />Lines w/ Sensor (L4) <br />794380-208 <br />Fill / Piping Sump <br />w/ Sensor (L2) <br />794380-208 <br />Spill Bucket <br />ATG <br />S' <br />Date map was drawn: 2/18/2016 <br />Instructions <br />Ifyou already have a diagram that shows all required information, you may include it, ratherthan this page, with your Monitoring System <br />Certification. On your site plan, show the general layout of tanks and piping. Clearly identify locations of the following equipment, if <br />installed: monitoring system control panels; sensors monitoring tank annular spaces, sumps, dispenser pans, spill containers, or other <br />secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level probes (if used for leak detection). In the <br />space provided, note the date this Site Plan was prepared. <br />
The URL can be used to link to this page
Your browser does not support the video tag.