Laserfiche WebLink
Site Address : 1812 Coley Ave. <br />UST Monitoring Site Plan <br />Escalon <br />6 <br />2016 <br />95320 <br />aftt ftionitoring Plan Site fliap <br />Drawing NOT to Scale <br />Pacific <br />Bell TelephoneCo. .b, i f i <br />Business Name. <br />12 <br />Bu Address: iColeyAve. Escalon <br />-i --------------- <br />Fuel', Transition Sump <br />Lines w/ Sensor (L4) <br />794380-208 <br />Fill / Piping Sump <br />w/ Sensor (L2) <br />794380-208 <br />Spill Bucket <br />ATG <br />S' <br />Date map was drawn: 2/18/2016 <br />Instructions <br />Ifyou already have a diagram that shows all required information, you may include it, ratherthan this page, with your Monitoring System <br />Certification. On your site plan, show the general layout of tanks and piping. Clearly identify locations of the following equipment, if <br />installed: monitoring system control panels; sensors monitoring tank annular spaces, sumps, dispenser pans, spill containers, or other <br />secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level probes (if used for leak detection). In the <br />space provided, note the date this Site Plan was prepared. <br />Vent Sump <br />Sensor <br />794380-208 <br />SensorAnnular <br />7M90-420 <br />1 Overfill <br />-i --------------- <br />Fuel', Transition Sump <br />Lines w/ Sensor (L4) <br />794380-208 <br />Fill / Piping Sump <br />w/ Sensor (L2) <br />794380-208 <br />Spill Bucket <br />ATG <br />S' <br />Date map was drawn: 2/18/2016 <br />Instructions <br />Ifyou already have a diagram that shows all required information, you may include it, ratherthan this page, with your Monitoring System <br />Certification. On your site plan, show the general layout of tanks and piping. Clearly identify locations of the following equipment, if <br />installed: monitoring system control panels; sensors monitoring tank annular spaces, sumps, dispenser pans, spill containers, or other <br />secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level probes (if used for leak detection). In the <br />space provided, note the date this Site Plan was prepared. <br />