My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLEY
>
1812
>
2300 - Underground Storage Tank Program
>
PR0231881
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2022 11:15:56 AM
Creation date
6/23/2020 6:59:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231881
PE
2371
FACILITY_ID
FA0003946
FACILITY_NAME
AT&T California - UG010
STREET_NUMBER
1812
STREET_NAME
COLEY
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22715414
CURRENT_STATUS
01
SITE_LOCATION
1812 Coley Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2371_PR0231881_1812 COLEY_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. Comments: <br />Additional sensors from page 1. <br />L-3 Vent sump 794380-208/515989 Certified. <br />L-4 Transition sump 794380-208/514107 Certified. <br />L-5 Inside Piping Pan 794390420/793173 Certified. <br />An overfi] l prevention valve is installed in the drop tube. <br />i <br />1RONMENTAI= <br />D. Results of Testing/Servicing <br />Software Version Installed: <br />120.00 <br />Complete the following checklist: <br />- _es <br />� � ii <br />� Yes <br />No * <br />au .._ <br />Is the audiblealarm operational? <br />haudible <br />i YesNo* <br />Is the visual alarm operational? <br />i' <br />Yes <br />No* <br />inspected,functional) tested, <br />Were all sensors visually y and confirmed operational? <br />� Yes ,1 <br />� No * <br />Were all sensors installed at lowest point of secondary containment and positioned so that other <br />P Y P equipment <br />will not interfere with their €< <br />ror o ration? <br />... \4`; u\\•45"d':. r.",'., //d,: 0Q ^r... xvr..:w' k\.r. .. ": \\\OC'.SS'?Yid#d5i'Eiert 1."r".,.✓.. L,d ?O'�:`O'r^d'tl�ikr'r"a\\ il.i!. Yl%3�\\"i«:: 3R`4}41RA 38llz`�\ \C�W\Cl� "•` w .,; '. \//% <br />�; <br />Yes <br />No* <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br />N/A <br />;operational? <br />Yes <br />No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary <br />�? <br />j? <br />v <br />containment monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which <br />N/A <br />sensors initiate positive shut -down? (Check all that apply) <br />Sump/TrenchSensors; F Dispenser Containment Sensors. Did you confirm positive shut -down( <br />due to 1 eaks and sensor failure/disconnection? ^' <br />Yes No <br />Yes <br />N o * <br />w i� <br />at utilize <br />For tanks systems tank 1 <br />the on saint system as the primary tank overfill warning device (i.e. no <br />` <br />mechanical overfill is <br />prevention), is the overfill warning alarm visible and audible at the <br />a <br />F <br />N/A <br />;tank fill point(s) and operating properly? If so, at what percent of tank capacity does the alarm trigger? <br />�( <br />Yes* <br />No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment <br />and list the manufacturer name and model for all replacement parts in Section E, below. 1 <br />`replaced <br />Yes* <br />No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that <br />apply) Product Water. If yes describe causes in Section E, below. <br />... _.::. <br />I Yes <br />No* <br />i .._....;;, ..: <br />as monitoring system set-up reviewed to ensure proper settings? Attach set up reports if applicable <br />Yes <br />No * <br />Is all monitoring equipment operational per manufacturer's specifications? <br />p <br />* In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. Comments: <br />Additional sensors from page 1. <br />L-3 Vent sump 794380-208/515989 Certified. <br />L-4 Transition sump 794380-208/514107 Certified. <br />L-5 Inside Piping Pan 794390420/793173 Certified. <br />An overfi] l prevention valve is installed in the drop tube. <br />i <br />1RONMENTAI= <br />
The URL can be used to link to this page
Your browser does not support the video tag.