My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLEY
>
1812
>
2300 - Underground Storage Tank Program
>
PR0231881
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2022 11:15:56 AM
Creation date
6/23/2020 6:59:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231881
PE
2371
FACILITY_ID
FA0003946
FACILITY_NAME
AT&T California - UG010
STREET_NUMBER
1812
STREET_NAME
COLEY
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22715414
CURRENT_STATUS
01
SITE_LOCATION
1812 Coley Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2371_PR0231881_1812 COLEY_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In -Tank Gauging / SIR Equipment: <br />F Check this box if tank gauging is used only for inventory control. <br />F Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />._ * <br />� � Yes r No <br />Has all input been <br />P wiring inspected for proper entry and termination, including testing for ground faults? <br />�r .;rr . r�r,• <br />n� a, �s� ,,ter<r <br />Yes No* <br />'-Were all tank gauging probes visually inspected for damage and residue buildup? <br />F Yes No* <br />Was accuracy of system product level readings tested? <br />.:�yi��a.ry`i:e \\\ - <br />- - .. O �✓.''3%y'F�@....6.�F/'zl�".P,k'vw" f, k:rS�^ti'Sda\\\4��X" �,.. <br />Yes r No* <br />Was accuracy of system water level readings tested? <br />r..aYes <br />r No * <br />Yes r No* <br />Were all probes reinstalled properly? <br />N/A <br />.. `\\\\��r " '�",.@Si '., `�,1771,57�'.�":,..�;�\'£t-,., <br />Yes No* <br />i'}3 �.a` \Q ��\.°kaiwYS\�4.��.d��.d a„SS�r�9. r#t�f'. �4�;...,*1Pa.\\\w44R`�.'...f/n•^a <br />Were all items on the equipment manufacturer s maintenance checklist completed? <br />*In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): rl'-' Check this box if LLDs are not installed. <br />Complete the following checklist: <br />_..:,. <br />Yes No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance. (Check <br />'3 <br />( N/A <br />all that apply) g <br />pp y) Simulated leak rate: 3 .p.h.; � 0.1 g.p.h; � 02g.p.h. <br />Yes <br />k. <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />F Yes <br />No* <br />Was the testing apparatus properly calibrated?_ <br />.::. <br />r..aYes <br />r No * <br />For mechanical LLDs, does the LLD restrict product flow if it detects a lea _. <br />p k7 <br />�.:w..... <br />N/A <br />i <br />�. ... _�, <br />;fir Yes <br />� No * <br />Forelectronic LLDs, does the turbineautoma tically shut off i f the LLD detects a leak? <br />N/A <br />i <br />� <br />Yes <br />� <br />No * <br />�� �� shut off if an ortionofthem <br />For electronic LLDs, does the turbine automaticall Y y p monitoring system is disabled or <br />N/A <br />disconnected? <br />r Yes <br />r No* <br />.. __.:. _ _ .... ..... ,,. .. : _.. <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or� <br />r N/A <br />fai Is a test? <br />F r Yes <br />r No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? J <br />h N/A <br />r Yes <br />r No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected <br />H. C om ments: <br />ction System <br />
The URL can be used to link to this page
Your browser does not support the video tag.