My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLEY
>
1812
>
2300 - Underground Storage Tank Program
>
PR0231881
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2022 11:15:56 AM
Creation date
6/23/2020 6:59:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231881
PE
2371
FACILITY_ID
FA0003946
FACILITY_NAME
AT&T California - UG010
STREET_NUMBER
1812
STREET_NAME
COLEY
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22715414
CURRENT_STATUS
01
SITE_LOCATION
1812 Coley Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2371_PR0231881_1812 COLEY_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST Monitoring Site Plan 0 <br />Site Address : 1812 COLEY AVE., Escaloq 95320 <br />Monitoring Plan Site Map <br />aW§�F <br />Drawing NOT to Scale <br />Business Name: Pacific Bell Telephone Co. dba AT&T Gal. (UG010) <br />Business Address: 1812 Coley Ave. Escalon <br />vent Sump <br />wl< Sensor (1-3) ATT building <br />794380-208 <br />Annular sensor <br />(L1) 794390420 TLS 350 Plus <br />(9 st Floor) <br />>r Engine Piping Tray <br />< .7 1 Sensor (Ls) <br />ar <br />c <br />Overfill e-------'794390-420 <br />t- (nAlarm <br />— ------------- <br />C7 = i ) +- <br />t <br />r i " Fuel Transition Sump <br />Lines wl Sensor (L4) <br />794380-208 <br />Fill l Piping Sump <br />wt Sensor (L2) <br />794380-208 sir <br />Spill Bucket _ <br />ATB i <br />_F <br />S' <br />Date map was drawn: 3/11/2015 <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System <br />Certification. On your site plan, show the general layout of tanks and piping. Clearly identify locations of the following equipment, if <br />installed: monitoring system control panels; sensors monitoring tank annular spaces, sumps, dispenser pans, spill containers, or other <br />secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level probes (if used for leak detection). In the <br />space provided, note the date this Site Plan was prepared. <br />I'aEGOVEL-,✓1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.