Laserfiche WebLink
ORECEIVED <br />SWRCB, January 2002 OCT 2 0 2016 <br />5. SECONDARY PIPE TESTING <br />inine-run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />15 min <br />Supply 0001 00001 <br />Return UG01 00001 <br />Test Start Time: <br />9:24am <br />Piping Material: <br />Poly <br />Initial Reading (Ri): <br />Poly <br />5 psi <br />Piping Manufacturer: <br />Test End Time: <br />Western Fiberglass <br />10:24am <br />Western Fiberglass <br />Final Reading (RF): <br />Piping Diameter: <br />5 psi <br />.75" <br />1.00" <br />1 hour <br />1 hour <br />Length of Piping Run: <br />Approx 30" <br />0 <br />Approx 30" <br />Product Stored: <br />0 <br />Diesel <br />Diesel <br />Test Result: <br />0 Pass ❑ Fail <br />Method and location of <br />❑ Pass ❑ Fail <br />Test boot <br />Test boot <br />inine-run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />15 min <br />15 min <br />Test Start Time: <br />9:24am <br />9:24am <br />Initial Reading (Ri): <br />5 psi <br />5 psi <br />Test End Time: <br />10:24am <br />10:24am <br />Final Reading (RF): <br />5 psi <br />5 psi <br />Test Duration: <br />1 hour <br />1 hour <br />Change in Reading (RF -R,): <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />0 <br />0 <br />Test Result: <br />0 Pass ❑ Fail <br />[F] Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑Fail <br />Comments —(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />