Laserfiche WebLink
Date map was drawn: <br />LUIUMAAMUS <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your onitoring <br />System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify locations of th following <br />equipment, if installed: monitoring system control panels; sensors monitoring tank annular spaces, sumps, dispenser Tons, spill <br />containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level pro Ns (if used <br />for leak detection). In the space provided, note the date this Site Plan was prepared, <br />Page 4 of 4 <br />UN -036-4/4 wwwxnidoman ev. 01/17/08 <br />=U:1'itL, <br />1016 <br />UST Momitoring Site Plan <br />i <br />MAR 3 0 <br />Site Address: 717 -W E:i6tn <br />W. -Q-G6T <br />.. <br />............................ <br />............. <br />....... <br />. . .......................... <br />...... <br />' L 6'IL IN -160 - <br />.................... <br />.......... <br />....................... <br />51'? w / Nil< ............ <br />.... ........... <br />...................... <br />.... I .............. <br />..................... <br />.................... <br />FILL..................................................... <br />)k- VAPOR <br />........... <br />U . . <br />... ............... <br />..... <br />. .... <br />........ <br />. <br />............ <br />L12- <br />r- . <br />7 U' Pk�-161"W <br />....... <br />. <br />:R] .... <br />�a-. ... — ..... <br />. .............. <br />............... <br />.... ....... <br />.... Ll PREM STP .... <br />.. <br />... ......... <br />........... <br />......... ...... <br />ME&t�lt <br />L7' KtA ILL <br />4PMC ............ <br />R.ViWr ........... <br />................... <br />........... <br />.. <br />. 2 ...... C ...... <br />r- -FiLL ................... <br />............ <br />....... <br />............... <br />.... L1 - VAMR VENT ................................................. <br />LJO bi-ea - J -*? ................................. <br />.............. <br />- .--. .... —.1 <br />— ........... <br />.... <br />.... Lit DISP 3-+- <br />.......................... <br />........ ............................. <br />I i5P ............................... <br />.... bi 6* <br />........ <br />............................... <br />It <br />---- <br />. .. <br />L14 bis P -9-10 <br />........ <br />.. ................ <br />LWIP'li <br />IS <br />................... <br />........... <br />...... <br />.......... <br />............... <br />.......... <br />.................. <br />... — .................. <br />.......... <br />........ <br />C-ST <br />.......... ...... <br />.......... <br />.................... <br />..... I ...... <br />.................... <br />..................... <br />............ <br />............ ....... <br />........... 11 .......... <br />................... <br />................ .. <br />-- .............. <br />– ... .. ...... <br />................ <br />................. <br />....... : ........ <br />Date map was drawn: <br />LUIUMAAMUS <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your onitoring <br />System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify locations of th following <br />equipment, if installed: monitoring system control panels; sensors monitoring tank annular spaces, sumps, dispenser Tons, spill <br />containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level pro Ns (if used <br />for leak detection). In the space provided, note the date this Site Plan was prepared, <br />Page 4 of 4 <br />UN -036-4/4 wwwxnidoman ev. 01/17/08 <br />