Laserfiche WebLink
F. 'in-Tng is used only for invert ory control. <br />-'Ta Gauging / SIR Equi0ent: 0 Check this box if tank O <br />_1 0 Check this box if no tank gauging or SIR equipmenti s installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection <br />Complete the following checklist: <br />0 Yes <br />I— <br />[51 IN o * <br />. nation, including testing for ground Malts-! <br />Has all input wiring been inspected for proper entry and termination, <br />Yes <br />No* <br />0 N/A <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />(D Yes <br />C] No* <br />Was accuracy of system Product level readings tested? <br />0 Yes <br />C] No* <br />0 Yes <br />0 No* <br />Was accuracy of system water level readings tested? <br />0 Yes <br />El No* <br />Were all probes reinstalled properly? <br />[:1 No* <br />N/A <br />0 N/A <br />[I No* <br />0 N/A <br />0 Yes <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />ENJED <br />b td <br />Yes <br />El No* <br />* In the Section H, below, describe how and when these deficiencies were or wJ e co <br />G. Line Leak Detectors (LLD): n Check this box if LLDs are not installed. <br />Com tete <br />the folio <br />mg cneemst: <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD, performance? <br />(Check all that apply) Simulated leak rate: ED 3 g.p.h.; 0 0.1 g.p.h ; 0 0.2 g.p.h. <br />Yes <br />No* <br />0 N/A <br />FOYesEl <br />Yes <br />Z 0 Y <br />0 No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />0 Yes <br />[3 No* <br />Was the testing apparatus properly calibrated? <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />s <br />fLLD detect a teak? <br />electronic LLDs, does the turbine automatically shut off if the <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring sy4em is disabled <br />or disconnected? <br />E3 Yes <br />rl No* <br />[I N/A <br />—6 Yes <br />[:1 No* <br />N/A <br />0 N/A <br />[I No* <br />0 N/A <br />0 Yes <br />0 Yes <br />M No* <br />g N/A <br />For electronic LLDs, does the turb*mautomatically shut off if any portion of themonitoring cyst malfunctions <br />or fails a test? <br />c I <br />For electronic LLDs, have all accessible wiring connections been visually inspected?? <br />ry <br />checklist completed? <br />Were all items on the equipment manufacturer's maintenance c <br />0 Yes <br />❑ No* <br />N/A <br />Fm—yes <br />n No* <br />