Laserfiche WebLink
0 Pae of _8_ <br />90R�M M <br />TestMethod Developed By:❑ Piping Manufacturer Z Industry Standard E] Professional E�gineer <br />Test Method Used: ®Pressure ❑ Vacuum Hydrostatic <br />[] Other (Specify) <br />Test Equipment Used: Pressure gauge, stop watch Equipment Resolution: <br />1.0 <br />P 'ping Run #Unlead <br />Piping Run #Premum Piping Run #Di esel <br />Piping Itun# <br />Piping Material: <br />fiberglass <br />fiberglass fiberglass <br />Piping Manufacturer: <br />A.O.Smith <br />A.O.Smith A.O.Smith <br />Piping Diameter: <br />3.5 <br />3.5 3.5 <br />Length of Piping Run: <br />160 <br />180 120 <br />Jam <br />V now <br />Product Stored: <br />gasoline <br />gasoline diesel <br />Method and location of <br />piping -run isolation: <br />test boot <br />test boot test boot <br />%R 3 0 2016 <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10mins <br />10mins lornins <br />ENVI 10NMLN <br />Test Start Time: <br />60mins <br />60mins 60mins <br />Initial Reading (RO: <br />5psi <br />5psi 5psi <br />Test End Time: <br />Omins <br />Omins Omins <br />Final Reading (RF): <br />Test Duration: <br />5psi <br />60mins <br />5psi 5psi <br />60mins 60mins <br />Change in Reading (RrR,): <br />0 <br />0 0 <br />Pass/Fail Threshold or <br />Criteria: <br />Opsi/60mins <br />Opsi/60mins Opsi/60mins <br />Test Result: <br />0 Pass 0 Fail <br />Pass El Fail Pass El Fail <br />E] El Fail <br />I <br />iq <br />