My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHTH
>
717
>
2300 - Underground Storage Tank Program
>
PR0522448
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2023 3:02:54 PM
Creation date
6/23/2020 6:59:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0522448
PE
2371
FACILITY_ID
FA0015274
FACILITY_NAME
SHELL I-5
STREET_NUMBER
717
Direction
W
STREET_NAME
EIGHTH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16314045
CURRENT_STATUS
01
SITE_LOCATION
717 W EIGHTH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2371_PR0522448_717 W EIGHTH_2016-2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />I—V &I V Fil M <br />Pd e of <br />0. qu I I "JLUx%_"JLk7A N-- - ---- <br />Test Method Developed By: F] UDC Manufacturer ❑ Industry Standard Professional gineer <br />❑ Other (Specify) <br />Method Used: E] Pressure Vacuum ®Hydrostatic <br />[] Other (Specify) <br />Test Equipment Used: Caldwell Level Indicator Equipment Resolution: .002 <br />UDC #11-12 <br />UDC #UC <br />UDC #9-10 <br />UDC Manufacturer: <br />o <br />o <br />UDC Material: <br />fiber lass <br />fiberglass <br />UDC Depth: <br />30 <br />30 <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />12 <br />12 <br />— <br />a )nirz <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />testing: <br />14 <br />clean <br />14 <br />clean <br />r L It h rimimai Ilr <br />Wr1 jr—nmr—Rap'l <br />Portion of UDC Testedr-- <br />2" above product <br />2" above product <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?* <br />OYesn No F1 NA <br />MYeso No F1 NA <br />FjYesF1 No El NA E]YI sE] No C] NA <br />31 <br />Turbine shutdown response time <br />No El NA <br />®Yes N <br />[]— <br />IZYesE] No EINA <br />Yes No El NA HY§sU No F-1 NA <br />Is system programmed for fail- <br />safe shutdown?* <br />CgYesFl No El NA <br />[DYes[:] No n NA <br />E]YesO No n NA ❑ s[:] No NA <br />Was fail-safe verified to be <br />operationalf <br />yes <br />yes <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />15miins <br />15mins <br />Test Start Time: <br />30mins <br />30mins <br />Initial Reading (Rt): <br />first circle <br />first circle <br />TestEnd Time: <br />Omins <br />Omins <br />Final Reading (RF): <br />no change <br />no change <br />Test Duration: <br />30mins <br />30mins <br />Change in Reading (RF -RD: <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />.005/60mins <br />.005/60mins <br />Test Result: <br />0 Pass EJ ] ail <br />0 Pass El Fail <br />E] Pass M_F_�i_ n >am [:1 Fail <br />Was sensor removed for testing? <br />NYesEl No EINA <br />®Yes El No El NA <br />E]YesE]�s[_] No 0 NA <br />Was sensor property replaced and <br />verified functional after test <br />[Dyesn No DNA <br />Eyes[:] No n NA <br />nYesn No n NA f0j SM No n NA <br />Comments — (include information on <br />to testing, and recommended <br />If the entire depth of the UDC is not tested, specify how much was tested. <br />asterisk (*) is "NO" or "NA", the entire UDC must ba4ested. <br />If the answer to my of the questions ipdicated with an <br />
The URL can be used to link to this page
Your browser does not support the video tag.