Laserfiche WebLink
7. UNDER -DISPENSER <br />30 <br />Test Method Developed By: M UDC Manufa <br />C] Other (Specif) <br />30 <br />Test Method Used: D Pressure <br />[I Other (Specif, <br />12 <br />Test Equipment Used: Caldwell Level Indicator <br />12 <br />14 <br />3 <br />UDC #1-2 <br />14 <br />UDC Manufacturer: <br />opw— <br />30mins 30mins <br />UDC Material: <br />fiber lass <br />2" above product.. <br />UDC Depth:_ <br />30 <br />®Yes[:] No R NA <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />12 <br />El No D NA <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />14 <br />0Y4;E1No[_1NA <br />Condition of UDC prior to <br />testing: <br />clean <br />NYesFjNonNA <br />Portion of UDC Tested <br />2" above "r du <br />yes <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?* <br />RYesEl No [0 b <br />yes <br />Turbine shutdown response time <br />ZYes [:] No <br />Is system programmed for fail- <br />safe shutdown?* <br />ZYes[] No <br />Was fail-safe verified to be <br />0 nal?' <br />yes <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />15rriins <br />_­ 0-_ <br />12A__ <br />0 P re of —8 - <br />CONTAINMENT (UDC) TESTING <br />curer n Industry Standard Professional igineer <br />n Vacuum ®Hydrostatic <br />Equipment Resolution: .002 <br />C #34 UDC #5-6 1 UDC 17-8 <br />30 <br />30 <br />first circle first circle <br />30 <br />12 <br />12 <br />Omins Orcins <br />12 <br />14 <br />14 <br />no change no change <br />14 <br />clean <br />clean <br />30mins 30mins <br />clean <br />2" above product <br />2" above product.. <br />2" J)ove <br />product <br />®Yes[:] No R NA <br />®Yes[:] No [] NA <br />[9Y, <br />El No D NA <br />®Yes EjNoE]N_A_ <br />®Yes [:1NoCjNA <br />0Y4;E1No[_1NA <br />ass El Fail <br />0YesE]NonNA <br />NYesFjNonNA <br />MYJ;nNoE]NA <br />El No El NA <br />yes <br />yes <br />RYesn No n NA ZYes[_-] No n NA <br />yes <br />15mins <br />15mins <br />15mins <br />cr.. . .. f716jv "I <br />Initial Reading (RD: <br />first circle <br />first circle first circle <br />Jrirst circle <br />Test End Time: <br />Orcins <br />Omins Orcins <br />11 omins <br />Final Reading (RF): <br />no change <br />no change no change <br />$o change <br />Test Duration: <br />30mins <br />30mins 30mins <br />30mins <br />Change in Reading (RF -RI): <br />0 <br />0 0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />.005/30mins <br />.005/30mins .005/30mins <br />5/60mins <br />Test Result: <br />Z Pass F-1 W <br />Pass n Fail Pass 0 Fail' <br />ass El Fail <br />Was sensor removed for testing? <br />OYes Ej No Q NA <br />OYeso No [:] NA ®Yes E:l <br />El No El NA <br />an <br />Was sensor properly replaced d <br />verified functional after testing? <br />OYesn No [:1 NA <br />. <br />RYesn No n NA ZYes[_-] No n NA <br />®Y sEl No [] NA <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed testsil <br />If the entire depth of the UDC is not tested, specify how much was tested. If the answer to My of the questions iicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. i <br />