Laserfiche WebLink
Page — of <br />8. UNDER -DISPENSER CONTAINMENT (UDC2 TESTING <br />Test Method Developed By: ❑ UDC Manufacturer ❑ Industry Standard Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure F1 Vacuum ®Hydrostatic <br />[I Other (Specify) <br />[Test Equipment Used: Caldwell Level Indicator Equipment Resolution: .002 <br />UDC Manufacturer: <br />UDC #9-10 <br />opw <br />UDC #11-12 <br />o <br />UDC # <br />UDC # <br />UDC Material: <br />fiberglass <br />fiber lass <br />UDC Depth: <br />30 <br />30 <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />12 <br />12 <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />14 <br />14 <br />Condition of UDC prior to <br />testing: <br />clean <br />clean <br />Portion of UDC Tested' <br />2" above product <br />2" above product <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?* <br />®Yes[:] No [_1 NA <br />®Yes[] No NA <br />[]YesE] No E] NA <br />[:IyesE] No E] NA <br />Turbine shutdown response time <br />---MYeso No [:] NA <br />_Z_ <br />Yes [] No [_JNA <br />Yes F No <br />-1 [T—NA <br />YesNo NA <br />E](I <br />Is system programmed for fail- <br />safe shutdown?* <br />ZYes[:1 No [:1 NA <br />NYesEl No [:1 NA <br />[:]Yesn No NA <br />E:]YesE] No 0 NA <br />Was fail-safe verified to be <br />operational?* <br />yes <br />yes <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />15mins <br />15mins <br />Test Start Time: <br />30mins <br />30mins <br />Initial Reading (111): <br />first circle <br />first circle <br />Test End Time: <br />Omins <br />Omins <br />Final Reading (RF): <br />no change <br />no change <br />Test Duration: <br />30mins <br />30mins <br />Change in Reading (RF -RI): <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />.005/60mins <br />.005/60mins <br />Test Result: <br />Z Pass El Fail <br />0 Pass 0 Fan <br />[I Pan [I Fail <br />El Pass ❑ Fail <br />Was sensor removed for testing? <br />Yes No [I NA <br />Yes No 0 _NA <br />Yes No NA <br />Yes No El NA <br />Was sensor properly replacedand <br />verified functional after testing? <br />M v; <br />. r_1 <br />NYes0 No El NA <br />NYesE3 No El NA <br />[:]YesE] NoE] NA <br />[]Yes[-No R NA <br />. COMMents — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NX', the entire UDC must be tested. <br />