Laserfiche WebLink
• <br />11 <br />• <br />UNIFIED PROGRAM CONSOLIDATED FORM <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - (Page 1 of 2) <br />TYPE OF ACTION ❑ 1. NEW PLAN 2. CHANGE OF INFORMATION 490-1. <br />PLAN TYPE In 1. MONITORING IS ID TICAL FOR ALL USTs AT THIS FACILITY. ago -z <br />(Check one item only) ❑ 2. THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br />I. FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) <br />1. <br />BUSINESS NAME (Same as Facility Name or DBA) 3. <br />BUSINESS SITE ADDRESS 103. <br />? W• 9 4bl <br />CITY 104- <br />II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br />Testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) must be performed at the frequency specified <br />by the equipment manufacturers' instructions, or annuall , whichever is more frequent. Such work must be performed by qualified personnel. [23 CCR §2632, 2634, 2638, 26411 <br />a90 -3a <br />MONITORING EQUIPMENT IS SERVICED L ANNUALLY ❑ 99. OTHER (Specify): 490-36. <br />III. MONITORING LOCATIONS <br />❑ 1. NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN 2. SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR §2632,26341 490-4. <br />. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all <br />IVthatapply) <br />1. CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br />WITH AUDIBLE AND VISUAL ALARMS. 123 CCR §2632,26341 <br />SECONDARY CONTAINMENT IS: ❑ a. DRY V b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. UNDER VACUUM 490-6. <br />PANEL MANUFACTURER: V F_>F_ p F_IL P-00 -T 490-7. MODEL #: 1 L S 3 5_0 490-8. <br />LEAK SENSOR MANUFACTURER: V F 6 D P-0-0 -.r 490-9. MODEL #(S): % q �'3 B Q - Z O 490-10. <br />[12. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(S). [23 CCR §26431 49x11. <br />PANEL MANUFACTURER: 490-12' MODEL #: 490-13' <br />IN -TANK PROBE MANUFACTURER: 490-14. MODEL #(S): 490-15. <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY 490-16. <br />❑ d. MONTHLY ❑ e. OTHER (Specify): 490-17. <br />490-18. <br />PROGRAMMED TESTS: ❑ a. 0.1 g.p.h. ❑ b. 0.2 g.p.h. ❑ c. OTHER (Specify): 490-19. <br />❑ 3. MONTHLY STATISTICAL INVENTORY RECONCILIATION [23 CCR §2646.1] 490'20' <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) [23 CCR §26451 TESTING PERIOD: C] a. 36 HOURS ❑ b. 60 HOURS 490-22. 21. <br />❑ 5. TANK INTEGRITY TESTING PER 123 CCR §2643.11 490-23. <br />c. OTHER (Specify): 49255.24. <br />TEST FREQUENCY: a. ANNUALLY ❑ b. BIENNIALLY El4 <br />_❑ <br />❑ 99. OTHER (Specify): 490.2726. <br />V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) "heck au <br />1. CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S) AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE & VISUAL ALARMS. 490-28. <br />[23 CCR SECONDARY CONTAINMENT IS: C34. DRY ❑ b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. UNDER VACUUM 490.29. <br />§2636] <br />PANEL MANUFACTURER: V £ E D IZ R- d O j 490-30. MODEL #: I (► -S " 3 �0 490-31. <br />LEAK SENSOR MANUFACTURER: 'V F_ E D ±]L f2-007- 490-32. MODEL #(S): % q _7 p Ef 490-33. <br />PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN. toa. YES ❑ b. NO 490-34' <br />FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. [�(a. YES ❑ b. NO 490-35' <br />2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36, <br />PRODUCT FLOW WHEN A LEAK IS DETECTED. [23 CCR§26361 <br />MLLD MANUFACTURER(S): SE F_ 2,F l.0 � 490 37' MODEL #(S): s t � f l..6 k.,;490-38. <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS. [23 CCR§26361 490-39. <br />ELLD MANUFACTURER(S): 490_40' MODEL #(S): 49041. <br />PROGRAMMED IN LINE LEAK TEST: Fla. MINIMUM MONTHLY 0.2 g.p.h. ❑ b. MINIMUM ANNUAL 0.1 g.p.h. 490-42. <br />ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO 490'43' <br />ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO 490' <br />❑ 4. PIPE INTEGRITY TESTING. 490-45, <br />490-06. <br />TEST FREQUENCY: a. ANNUALLY ❑ b. EVERY 3 YEARS ❑ c. OTHER (Specify) 490-47. _ <br />_❑ <br />❑ 5. VISUAL PIPE MONITORING. 490.48. <br />FREQUENCY: ❑ a. DAILY ❑ b. WEEKLY ❑ C. MIN. MONTHLY & EACH TIME SYSTEM OPERATED* 49x49. <br />Allowed for mmitoring of unburied emergency generator fuel piping only r HSC 25281.5(6)(3 <br />❑ 6. SUCTION PIPING MEETS EXEMPTION CRITERIA. 123 CCR §2636(ax3)] 490-50. <br />❑ 7. NO REGULATED PIPING PER HEALTH AND SAFETY CODE, DIVISION 20, CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490"51. <br />❑ 99. OTHER (Specify) 49as3.52. <br />UPCF UST -D (12/2007) -1/4 f3 •7 V A f C fL L ESS www.uuidocs.org C <br />oj I %/AR0rL LF -SS (VM f 1 <br />Di FS EL • ✓ E D iL®QT <br />i/MT) i-- 17. 2voo <br />LD20D6 <br />PXIDV <br />