Laserfiche WebLink
• <br />• <br />UNIFIED PROGRAM CONSOLIDATED FORM <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - (Page 2 of 2) <br />VI. UNDER DISPENSER CONTAINMENT (UDC) MONITORING (Check all <br />that <br />a l <br />UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br />I. CONTINUOUS ELECTRONIC MONITORING El2. FLOAT AND CHAIN ASSEMBLY ❑ 3. ELECTRONIC STAND-ALONE <br />490-54& <br />4. NO DISPENSERS_______ E]99. OTHER (Specify) <br />490-54b. <br />_ _ _ __ _ <br />LEAK MONITOR MANUFACTURER: V t E 17 IZUO T 490-55. MODEL #: <br />490-56. <br />LEAK SENSOR MANUFACTURER: J EE D t IL top "-r 490-57. MODEL #(S): -794-346 O `- Z o 0 <br />490-5a. <br />DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. a. YES ❑ b. NO <br />490-59 <br />UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a. YES ❑ b. NO <br />490-60. <br />FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a. YES ❑ b. NO <br />490-61. <br />UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. a. YES ❑ b. NO <br />490-62. <br />UDC CONSTRUCTION IS: It 1. SINGLE WALL ❑ 2. DOUBLE WALL <br />490-63 <br />IF DOUBLE WALL: <br />490-64& <br />UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a. LIQUID ❑ b. PRESSURE ❑ c. VACUUM <br />A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a. YES ❑ b. NO <br />490-64b, <br />VII. PERIODIC SYSTEM TESTING <br />❑ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED <br />490-65, <br />LEAK DETECTION ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 123 CCR §2644.11 <br />® 2. SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. <br />490-66. <br />® 3. SPILL BUCKETS ARE TESTED ANNUALLY. <br />490-67. <br />VIII. RECORD KEEPING <br />The following monitoring/maintenance records are kept for this facility: <br />490-68. <br />® a. ALARM LOGS ❑ b. VISUAL INSPECTION RECORDS ❑ c. TANK INTEGRITY TESTING RESULTS <br />❑ d. SIR TESTING RESULTS (and supporting documentation records) ❑ e. TANK GAUGING RESULTS (and supporting documentation records) <br />❑ f ATG TESTING RESULTS (and supporting documentation records) ❑ g. CORROSION PROTECTION 60 -DAY LOGS <br />® h. EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br />IX. TRAINING <br />® Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: <br />490-698. <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) <br />® THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) <br />490-69b <br />® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) <br />490-69c <br />❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br />490-69d. <br />❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br />490-69e. <br />❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />490-69f. <br />STATISTICAL INVENTORY RECONCILIATION" <br />❑ SWRCB PUBLICATION: "UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" <br />490-69g. <br />C] OTHER (Specify): <br />490-69i. <br />® This facility has a "Designated UST Operator" who has passed the California UST System Operator Exam administered by the International Code Council <br />490-70. <br />(ICC). The "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems annually, and within 30 <br />days of hire. This training will include, but is not limited to, the following: <br />➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br />➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br />➢ The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br />➢ Name(s) of contact person(s) for emergencies and monitoring alarms. <br />X. COMMENTS/ADDITIONAL INFORMATION <br />Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. <br />490.71. <br />ALAP-M S UJ)iO vistIAL. (- 0d`, <br />XI. PERSONNEL RESPONSIBILITIES <br />The UST Owner/Operator is responsible for ensuring that: 1.) the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br />by this Ian occurs; 2.) all conditions that indicate a possible release are investigated; and 3 11 monitoring records are maintained properly. <br />THE FOLLOWING PERSON(S) ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br />NAME: J G k 4--')A K)6i- T2I/A I 490-72. TITLE: Ov,) F- p- L O P E jL R 1 D %L <br />490-73. <br />NAME: 490-74. TITLE: <br />490-75. <br />The Designated UST Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br />conditions that need follow-up action. <br />XII. OWNER/OPERATOR SIGNATURE <br />CERTIFICATION: I certify that th 'nformation provided herein is true and accurate to the best of my knowledge. <br />APPLICANT SIGNATURE <br />CWS <br />DATE: <br />3/2 2-/ I U <br />490.77. <br />REPRESENTING: ❑ 1. Tank Owner/Operwor . Facility Owner/ or :13. Authorized Re mmtative of Owner 490-76. <br />APPLICANT NAME (print): 490-78. <br />1i CTP-: bA►Jci-iRpN <br />APPLICANT TITLE: <br />0V-'>✓ E 4- <br />490-79' <br />UPCF UST -D (12/2007) - 3/4 www.unidoes.org <br />