My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHTH
>
717
>
2300 - Underground Storage Tank Program
>
PR0522448
>
COMPLIANCE INFO_2007-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 2:00:07 PM
Creation date
6/23/2020 6:59:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2015
RECORD_ID
PR0522448
PE
2371
FACILITY_ID
FA0015274
FACILITY_NAME
SHELL I-5
STREET_NUMBER
717
Direction
W
STREET_NAME
EIGHTH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16314045
CURRENT_STATUS
01
SITE_LOCATION
717 W EIGHTH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2371_PR0522448_717 W EIGHTH_2007-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
438
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of _8_ <br />8. UNDER -DISPENSER CONTAINMENT (UDC) TESTING <br />Test Method Developed By: ❑ UDC Manufacturer ❑ Industry Standard ® Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ vacuum ®Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Caldwell Level Indicator <br />Equipment Resolution: .002 <br />UDC #9-10 <br />UDC #11-12 <br />UDC # <br />UDC # <br />UDC Manufacturer: <br />opw <br />opw <br />UDC Material: <br />fiberglass <br />fiberglass <br />UDC Depth: <br />30 <br />30 <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />12 <br />12 <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />14 <br />14 <br />Condition of UDC prior to <br />testing: <br />clean <br />clean <br />Portion of UDC Tested <br />2" above product <br />2" above product <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?* <br />®Yes❑ No ❑ NA <br />®Yes[—] No ❑ NA <br />❑Yes❑ No ❑ NA <br />❑Yes❑ No ❑ NA <br />Turbine shutdown response time <br />®Yes❑ No ❑ NA <br />®Yes❑ No ❑NA <br />❑Yes❑ No ❑ NA <br />❑Yes❑ No ❑ NA <br />Is system programmed for fail- <br />safe shutdown?' <br />®yes❑ No ❑ NA <br />®Yes❑ No ❑ NA <br />[—]Yes[-] No ❑ NA <br />❑Yes❑ No ❑ NA <br />Was fail-safe verified to be <br />operational?* <br />yes <br />yes <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />15mins <br />15mins <br />Test Start Time: <br />30mins <br />30mins <br />Initial Reading (Ri): <br />first circle <br />first circle <br />Test End Time: <br />Omins <br />Omins <br />Final Reading (RF): <br />no change <br />no change <br />Test Duration: <br />30mins <br />30mins <br />Change in Reading (RF -R,): <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />.005/60mins <br />.005/60mins <br />Test Result: <br />® Pass ❑ Fail <br />® Pass: ❑ Fail <br />❑ Pass El Fail <br />❑ Pass ❑ Fail <br />Was sensor removed for testing? <br />®Yes❑ No ❑ NA <br />®Yes❑ No ❑ NA <br />❑Yes❑ No ❑ NA <br />❑Yes❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />®Yes❑ No ❑ NA <br />®Yes❑ No ❑ NA <br />[—]Yes[:] No ❑ NA <br />❑Yes❑ No ❑ NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />All sensors are tested during annual monitoring certification. <br />Page 6 of 8 <br />1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to Any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. <br />
The URL can be used to link to this page
Your browser does not support the video tag.