Laserfiche WebLink
Spill Prevention Compliance Corporation <br /> Periodic integrity Test Certificate <br /> P.O. Box 1289........Waterford, CA 95386 Telephone: (209) 969-0851 <br /> Email: ��c r �hotmail.cam <br /> Client: Chase Chevrolet Contact : Alex Robinson Service Manager <br /> Address: 6441 Holman Rd. Phone No.: 209-475-6640 <br /> City/State/Zip; Stockton, CA 95212 Date of Test: 10-9-19 <br /> Product Stored: Waste Coolant-Poi -a <br /> Tank Information(Brand/gallonage/Fuel Stored/UL or other serial#/miscellaneous) <br /> Poly Processin 200 als/Waste CoolantlDoubleWall Poly IS09000-40CFR-264193 com Iiant/15 rs old est. <br /> Description of Secondary Containment Integral Secondary Containment <br /> Date of Test 10-9-19 Test Supervisor(s) Todd McWhorter <br /> METHOD OF PERIODIC INTEGRITY TEST-Primary XX SecondaryXX <br /> 1. Poly Outer Wall Thickness Test(in accordance with IS09000/9014 in compliance with 40CFR-264.193 - <br /> readings avg. 7.2mm thickness-as measured (20 Pts. on outer wall) Suitable for continued usage <br /> 2. Inert Gas Blanket <br /> Gas Used: Nitrogen ; CO2: ; Other(specify) <br /> Air Pressure-Test ; Vacuum Test--; <br /> Initial Reading (document psi/WC readings) Time <br /> End Readings (document psi/WC readings) Time <br /> Duration of Test: % drop <br /> 3. Sonar-Test_Y_N (document db readings) Duration <br /> 4. Camera(visual) /interstitial (Result: P/F) <br /> 5. Hydro-Carbon Sensor(probe) model (Result: P/F) <br /> 6. Hydrology (Water Column) (inches of water column readings) <br /> Duration % Drop Results (P/F)ar <br /> 7. Other: Inspect Prim y Vessel & Secondary containment. CRDM present, no evidence of leaking <br /> product from Primary vessels stem accessible for inspection: AST sits within secured lubricants <br /> basement. Tank has continuous electronic monitoring & BJ Enter rises Sentry Alarm siren for hi <br /> levels. Upon inspection,no evidence of seam breaks,punctures,cracks,or other structural damage to the <br /> tank. Leak detection is assured via inspections of the secondary containment. Basement has additional <br /> containment capacity of 69,000+gals. No evidence of leak nor of any product in secondary. PASS <br /> TEST RESULTS <br /> 1`1-Stage: <br /> Pass XX Fail_(quantify) OUTER WALL THICKNESS=7.2mm ON SIDE AVG. SUITABLE <br /> R <br /> FOCONTINUED USAGE <br /> 2" -Stage: <br /> Pass XX Fail_(quantify) NO VISUAL EVIDENCE OF PRODUCT IN INTERSTICE OR ANY <br /> OTHER LEAKS <br /> Comments_ Tank is anchored to concrete floor with steel brackets & -/, anchor bolts data on file <br /> Date of Next Scheduled Periodic Integrity Test 10-9-24 <br /> J""dl-ft4tW <br /> SPC Corp Representative <br /> STI SP001 Certified Inspector No.: AST 135013 <br />