My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOLMAN
>
6441
>
2200 - Hazardous Waste Program
>
PR0514322
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 4:45:20 PM
Creation date
6/25/2020 10:49:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0514322
PE
2229
FACILITY_ID
FA0010424
FACILITY_NAME
CHASE CHEVROLET
STREET_NUMBER
6441
STREET_NAME
HOLMAN
STREET_TYPE
RD
City
STOCKTON
Zip
95212
CURRENT_STATUS
01
SITE_LOCATION
6441 HOLMAN RD
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spill Prevention Compliance Corporation <br /> P .O . Box 1289 . . . . . . . . Waterford, CA 95386 Telephone : (209) 969-0851 <br /> Email : spccorp (i4hotmail . com <br /> Website: www.speplan . com <br /> Certified Assessment Form (PE) for AST Systems <br /> Assessor : Spill Prevention Compliance Corporation Onsite Assessor : Todd McWhorter <br /> P.O. Box 1289 Telephone: (209) 969-0851 <br /> Waterford, CA 95386 email : snccorp &hotmail. com <br /> Client : Chase Chevrolet Contact : Alex Robinson , Service Manager <br /> Address : 6441 Holman Rd . Phone No. : 209475-6640 <br /> City/State/Zip ; Stockton , CA 95212 Date of Test: 10-949 <br /> Assessment Data- Waste Oil AST -b <br /> 1 . AST Configuration & age of AST Horizontal AST Double wall steel/approx 14 yrs old ( 0812005 ) <br /> Ia. Useful Life Remaining of AST AST has approximately 30 years of remaining life (Subsection kl -k10) <br /> 2 . AST Primary vessel construction (describe) 1500 gals/Waste OIWL# P-77880 /UL142-Container/ Made to <br /> UL 142 construction standard-at least . 167 in. steel thickness per UL Std for Safety for Steel Aboveground <br /> Tanks for Flammable and Combustible Linuids, suitable for containine waste oil, <br /> 3 . AST piping (describe) _ _1 in . hydraulic hose to 1 in. copper nine from four (4) Graco Husky 1040 pneumatic <br /> pumps to 1 in. hydraulic hose to 2 in openine w/fitting. from pump for suanly to top of AST. There is an <br /> inline check valve between supply hoses & pump. Piping is adequately secured , supported & protected <br /> against physical damage and excessive stress due to settlement, vibration, expansion or contraction , & was <br /> tested , found to he in good condition & not leaking, <br /> 4 . Intemal/External pump description_ external steel pillar mounted four (4) Graco Husky 1040 pneumatic <br /> Pumps w/2 solenoid 12yoltmWas200psi-w/continuous electronic monitoring & pneumatic auto shut down- <br /> Pumping is initially from operations containment boxes to pump via hydraulic hoses, and then to the AST. <br /> External pump, which pumps from traveling containment boxes which receives product from vehicle.5 }!bove. <br /> and then is pumped into the AST. The pumps have an inline check valve to prevent siphoniniz thru supply <br /> hoses. Ancillary equipment is secured to wall, & supported and protected against physical damage and <br /> excessive stress due to settlement. vibration , expansion or contraction (see pie) <br /> 5. AST drawing (provided/drawn: source) (see attached) <br /> 6. Design Standard (ASME, UL, etc .) UL 142 -Double Wall Steel /Mfr: Containment Solutions <br /> 7. AST foundation (describe) concrete sulrfloor, Base of AST under UL 142 adequate to withstand the load <br /> of a full tank-Tank is anchored to concrete basement floor. <br /> 8 . AST anchoring (seismic zone/floatation risk) AST is anchored , with steel flange anchor feet, which are <br /> welded to outer shell of tank, & % in . anchor bolts into the concrete floor, thru the openings provided in the <br /> tanks anchor flanges. Stockton is a (groundshaking) seismic region , These anchors are intended to secure the <br /> tank during a seismic event. There are two scenarios which would create loads upon them. The first scenario <br /> is an empty tank. With an empty tank, the expansion anchors resist the overturning moment through their <br /> tensile (pull-out) capacity. Since the anchors are installed at the perimeter of the tank, the distance between <br /> anchors (in either direction) provides a sufficient lever arm for the concrete anchors to not exceed their <br /> allowable null-out capacity. The second load case is with a partially full or full tank. In this scenario, because <br /> the liquid fills the bottom of the tank and increases its weight, the governing load case becomes the shear <br /> capacity of the concrete expansion anchors In the shear loading, all anchors resist the loads and their <br /> allowable capacity is not exceeded . This load case 15 conservative in its analysis since it neglects the friction <br /> force created by the weight of the partially full or full tank. This tank' s rear is against the concrete support <br /> structure at the wall, which further acts as a barrier to movement in the event of an earthquake. AST is <br />
The URL can be used to link to this page
Your browser does not support the video tag.