Laserfiche WebLink
Emergency Response Action Plan Version :27.10.4 <br /> RESOURCES <br /> RESPONSEEMERGENCY • <br /> Date of Last Update: Last Inspection or Response <br /> Equipment Test Date: <br /> Inspected By: Last Deployment Drill Date: <br /> Inspection Frequency: Deployment Frequency: <br /> Fire/Rescue Equipment: <br /> . . <br /> Type/Year/Shelf Operational Quantity <br /> Life Status <br /> 20 lbs. <br /> ABC/2004/Note 1 Ready 1 Office <br /> 5 lbs. BC/2016/Note Ready 1 Break Room <br /> 1 <br /> 5 lbs. ABC/2007/Note Ready 1 Warehouse <br /> 1 <br /> 20 lbs. Ready 1 Forklift <br /> ABC/2015/Note 1 <br /> 10 lbs. Ready 1 Foam Shed <br /> ABC/2012/Note 1 <br /> 40 lbs. Ready 1 Lanell <br /> ABC/2007/Note 1 <br /> 40 lbs. Ready 1 Lane 2 <br /> ABC/2007/Note 1 <br /> 40 lbs. Ready 1 Lane 3 <br /> ABC/2006/Note 1 <br /> 40 lbs. Ready 1 Pipe Bridge <br /> ABC/2006/Note 1 <br /> 40 lbs. Ready 1 L&B Shop <br /> ABC/2006/Note 1 <br /> 40 lbs. Ready 1 VRU <br /> ABC/2004/Note 1 <br /> 40 lbs. Ready 1 Elect. Cab. <br /> ABC/1997/Note 1 <br /> 40 lbs. Ready 1 Ethanol Pumps <br /> ABC/2008/Note 1 <br /> 40 lbs. Ready 1 Regular Pumps <br /> ABC/1981/Note 1 <br /> 40 lbs. Ready 1 Manifold <br /> ABC/2007/Note 1 <br /> 40 lbs. Ready 2 Spare/Warehouse <br /> ABC/2006/Note 1 <br /> Shell Supply and Distribution ERAP-58 Stockton Terminal FRP <br /> ©2019 Witt O' Brien's Revision Date:October, 2019 <br />