My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STIMSON
>
2000
>
2900 - Site Mitigation Program
>
PR0009229
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2020 8:05:45 AM
Creation date
6/26/2020 5:02:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009229
PE
2960
FACILITY_ID
FA0004047
FACILITY_NAME
STOCKTON ARMY AIR SUPPORT FAC
STREET_NUMBER
2000
STREET_NAME
STIMSON
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17726004
CURRENT_STATUS
01
SITE_LOCATION
2000 STIMSON ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CA ARNG Field Quality Assurance Project Plan <br /> Health and Safety Data Sheet <br /> 9.1.9.10 Health and safety information will be obtained at each borehole and recorded on the Health <br /> and Safety Screening Data Sheet(Figure 9-6 at the end of the section).Hata to be recorded includes: <br /> • Boring ID; <br /> • Screener's initials; <br /> • Date; <br /> • Time; <br /> Depth; <br /> • PID reading; <br /> • Flame ionization detector(FID)reading(if applicable); <br /> • Combustible gas indicator(CGI)reading(if applicable);and <br /> • Detector tube results(if applicable). <br /> Well Development Data Sheets <br /> 9.1.9.11 Well development data will be-recorded on the well development log.An example of the well <br /> development log is shown in Figure 9-7 at the end of the section. Data to be recorded includes the <br /> following: - - <br /> • Static water level; <br /> • Depth to water after development; <br /> • Standing water column; <br /> • Well and purge volumes; <br /> • Development method; <br /> • Time; <br /> • Field parameters measured(including pH,SC,turbidity); <br /> • Any conditions that may affect development(including estimated permeability of saturated <br /> materials); <br /> • Weather conditions;and <br /> • Equipment calibration information. <br /> field QAPP_DOC 9-15 May 2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.