Laserfiche WebLink
Work Plan for Groundwater Monitoring Well Installation, <br /> Soil Gas and Groundwater Investigation, <br /> and Groundwater Monitoring <br /> Army Aviation Support Facility, Stockton, California <br /> 7.0 REFERENCES <br /> California Environmental Protection Agency (CaIEPA), 2010. Advisory—Active Soil Gas <br /> Investigation. Draft for Review. March. <br /> Central Valley Regional Water Quality Control Board (CVRWQCB), 1990. Tri-Regional Board <br /> Staff Recommendations for Preliminary Investigation and Evaluation of Underground <br /> Tank Sites. August 10. <br /> Department of Water Resources, 1980. Groundwater Basins in California:A Report to the <br /> Legislature in Response to Water Code Section 12924, Bulletin 118-80. January. <br /> Oneida Total Integrated Enterprises (OTIE), 2010. Groundwater Monitoring Well Installation <br /> and First Quarter 2010 Groundwater Monitoring Report, California Army National Guard <br /> Field Maintenance Shop #24, Stockton, California. Final. September. <br /> San Joaquin County Environmental Health Department (SJCEHD), 2005. Well Standards (San <br /> Joaquin County Ordinance Code Section 9-1115.6). February. <br /> U.S. Environmental Protection Agency (USEPA), 1996. Low Stress (Low Flow) Purging and <br /> Sampling Procedure for the Collection of Groundwater Samples from Monitoring Wells, <br /> July 30. <br /> URS, 2008. California Army National Guard, Site Investigation Report for the Underground <br /> Storage Tank Location at the Army Aviation Support Facility, Stockton, CA. June. <br /> Versar, Inc. (Versar), 2004. Preliminary Assessment/Site Investigation Update Report California <br /> Army National Guard Facility. Final. September <br /> Versar, 2007. Type II Work Plan—Addendum, UXO Construction Activities and Soil Removal <br /> Action, California Army National Guard Facility, Stockton, California. April. <br /> OTI E 19 <br />