Laserfiche WebLink
name and address,the accumulation start date and will state"Universal Waste <br /> Mercury Switches" <br /> Storage: Mercury buckets will be stored in the desigzlated hazardous waste <br /> location on site. <br /> Management and Recordkeeping: As each container is filled, it is sealed and <br /> logged into Onsite's recordkeeping database. This is used to ensure the <br /> storage time is not exceeded on this material. On a monthly basis,the <br /> Warehouse Foreman conducts a safety inspection at which time he will check <br /> any partially tilled containers to ensure they have not exceeded their storage <br /> limitation. Alien material-is shipped,the shipment information is tracked in <br /> the database. <br /> Disposition: Mercury switches are sent to Waste Management Lamptracker for <br /> recovery of the mercury. Lamptracker provides a truck to transport the <br /> material to their facility which will be shipped utilizing a bi.11 of lading. <br /> Refrigerant and Compressor Oils <br /> Packaging: 30 or 55 gallon steel drum <br /> Labeling: Labels will be affixed to the drum at the time the first oil is placed in <br /> the drum. The label will have the generator name and address,the <br /> accumulation start date and will state "Used Oil —Hazardous Waste" <br /> Storage: Used oil drums will be stored in the designated hazardous waste location <br /> on site. <br /> Management and Recordkeeping: As each container is filled, it is sealed and <br /> logged into Onsite's recordkeeping database. This is used to ensure the <br /> storage time is not exceeded on this material. On a monthly basis, the <br /> Warehouse Foreman conducts a safety inspection at which time he will check <br /> any partially filled containers to ensure they have not exceeded their storage <br /> limitation. When material is shipped, the shipment information is tracked in <br /> the database. <br /> Disposition: Refrigerant and Compressor oils are sent to Evergreen <br /> Environmental for recycling. Evergreen provides the truck and the manifest <br /> or bill of lading for each shipment. <br /> PCB Capacitors <br /> Packaging: 5 gallon bucket with screw top lids. PCB and non-PCD capacitors <br /> will be packaged in separate buckets. <br /> Labeling: Labels will be affixed to the drum at the time the first a capacitor is <br /> placed in the drum. PCB Capacitors will be labeled with a standard PCB <br /> Label, stating"Contains PCB's"and listing the out of service date. <br /> Capacitors will be labeled "Used Capacitors". <br /> Storage: Used capacitor containers will be stored in the designated hazardous <br /> waste location on site. <br /> Management and Recordkeeping As each container is .filled., .it is sealed and <br /> logged into Onsite's recordkeeping database. This is used to ensure the <br /> storage time is not exceeded on this material. On a monthly basis.the <br /> Warehouse Foreman conducts a safety inspection at which time lie will check <br /> any partially filled containers to ensure they have not exceeded their storage <br /> limitation. When material is shipped, the shipment information is tracked in <br /> the database. <br />